My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
15237
>
2300 - Underground Storage Tank Program
>
PR0517272
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2026 8:09:31 PM
Creation date
3/10/2025 11:17:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0517272
PE
2361 - UST FACILITY
FACILITY_ID
FA0012979
FACILITY_NAME
FLYING J TRAVEL PLAZA #617
STREET_NUMBER
15237
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
Lodi
Zip
95242
APN
02519014
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
15237 N Thornton RD Lodi 95242
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill,overfill,Leak Detection and Secondary Containment Equipment at UST Facilities <br /> ■ inspect and reinstall all containment sump If the water level changes IA(0,125)inch or great- <br /> lids,gaskets and covers, er, the containment sump fails the integrity test. <br /> 6.5.7 Pass/Fail Criteria. If the water level 6.6 Accelerated Precision Hydrostatic'hest for Spill <br /> changes less than 118(0.125)inch,the containment Buckets and Containment Sumps. Electronic preci- <br /> sump passes the integrity test, sion test equipment can be utilized to test spill buckets <br /> and containment sumps. It incorporates more sensitive <br /> equipment that permits a test to be conducted in a shorter <br /> period of time.The procedures use the same test fluid and <br /> tests the same volume as other methods outlined in this <br /> chapter.The manufacturer of the measurement equipment <br /> should specify the precision and duration of the test and <br /> the pass/fail criteria. However, passlfail criteria should <br /> �. not he less stringent than those prescribed for the 1-hour <br /> # test in Section 6.5.7. <br /> x�> <br /> The data sheet for Sections 6.2 or 6.5 may be used for this <br /> r f test.Refer to Appendix D. <br /> 6.7 Proper Disposal of Test Liquids. Test liquids <br /> must be disposed of properly, Check with the AHJ <br /> regarding requirements for proper disposal. <br /> FIGURE 6.7. The test 170d level in the tank sump must <br /> be at least 4 inches above the highest sump penetra- <br /> tlon or sidewail seam. <br /> 7� UST OVERFILL EQUIPMENT <br /> 9. VER!RCATIONy INSPECTION <br /> �� R} AND TESTING <br /> Although the effectiveness of overfill prevention devices <br /> { can be tested by attempting to overfill a LIST with <br /> product and determining how well the device functions, <br /> this approach is not recommended. Any malfunction in <br /> k7, the overfill prevention device could result in a product <br /> t elease that could result in a threat to public health and <br /> safety and environmental damage. <br /> V F . - <br /> 7' Federal LIST rules require that overfill prevention equip- <br /> ` ::;_.:;,,Is meat automatically restrict flaw or alert the transfer <br /> .. operator when the tank is no more than 90 percent full <br /> kc <br /> or shut off flow into a tank when it is no more than 95 <br /> percent full.Other alternatives to prevent overfills are the <br /> . A.- r restriction of flow during a delivery 30 minutes prior to <br /> overfilling;alerting the operator 1 minute before overfill- <br /> ing may occur; or automatically shutting off flow into a <br /> tank so that none of the fittings located on tap of the tank <br /> are exposed to product due to overfilling, <br /> The committee has written the recommended practices <br /> FIGURE 6-8. Measuring sucks used to measure the for automatic shutoff devices to reflect that the devices <br /> water level should be securely mounted to ensure that must be set to shut off flow when the tank is no more <br /> they do not move during the test. than 95 percent full, and flow restriction and overfill <br /> pei.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.