Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared. <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Map <br /> Site Address: <br /> Jack N the Box Store <br /> TLS 350 <br /> Carwash <br /> PT,o <br /> -1 <br /> 11/ 7/8 3/4 <br /> 12 <br /> X P <br /> X S <br /> XX Die L A L <br /> Vent P <br /> RON x <br /> X F X V <br /> x V X <br /> F <br /> X F <br /> X <br /> X L <br /> X P <br /> KEY <br /> A=ANNULAR Sensor <br /> F=N7LLS <br /> V=VAPOR <br /> *PIPING P=PROBE <br /> (ARROWS) DATE SITE MAP DRAWN: L=Turbine/Leak Detector <br /> Drawing of piping exit of X=SUMP SENSOR <br /> Sump and UDC's.No B=Brine Sensor <br /> underground drawing is ; <br /> =Smart Sensor <br /> accurate,we cannot <br /> 1iy4flenanararllle�w-exol�rsi6lela!]uresrl�{�irrgi�lvarauxusu C=Floats&Chains <br /> speculate blue prints. sioreal mn o mrl as sd r $ Dm1. E=E Stop <br /> Fps �F +�� �'.fa'rfornzulwxr3F�T � <br /> Page 6 of 6 <br />