My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2500864
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROUGH AND READY ISLAND
>
0
>
2900 - Site Mitigation Program
>
SR2500864
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 11:15:25 AM
Creation date
3/10/2025 4:06:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2500864
PE
2900 - Site Mitigation Program
STREET_NUMBER
0
STREET_NAME
ROUGH AND READY ISLAND
City
Stockton
Zip
95203
APN
16203007
CURRENT_STATUS
Pending
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
ROUGH AND READY ISLAND Stockton 95203
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosynte& <br /> consultants <br /> TABLE OF CONTENTS <br /> 1. INTRODUCTION....................................................................................................................1 <br /> 1.1 UST 817B Background...................................................................................................1 <br /> 1.2 Summary of Previous Environmental Investigations......................................................2 <br /> 1.3 Site Geology &Hydrogeology........................................................................................4 <br /> 2. INVESTIGATION OBJECTIVES AND APPROACH...........................................................4 <br /> 3. SUMMARY OF INVESTIGATION ACTIVITIES.................................................................5 <br /> 4. INVESTIGATION WORK PLAN...........................................................................................6 <br /> 4.1 Pre-field Activities ..........................................................................................................6 <br /> 4.2 Field Activities................................................................................................................6 <br /> 4.2.1 Soil Sampling......................................................................................................7 <br /> 4.2.2 Grab Groundwater Sampling...............................................................................7 <br /> 4.2.3 Groundwater Monitoring Well Sampling............................................................8 <br /> 4.2.4 Soil Vapor Probe Installation..............................................................................8 <br /> 4.2.5 Soil Vapor Sampling...........................................................................................9 <br /> 4.2.6 Sample Labeling, Handling, and Analysis........................................................10 <br /> 4.2.7 Equipment Decontamination Procedures..........................................................12 <br /> 4.2.8 Investigation-Derived Waste.............................................................................12 <br /> 4.2.9 Site Restoration.................................................................................................13 <br /> 4.3 Quality Control Samples...............................................................................................13 <br /> 4.3.1 Trip Blanks........................................................................................................13 <br /> 4.3.2 Field Blanks.......................................................................................................13 <br /> 4.3.3 Field Duplicate Samples....................................................................................13 <br /> 4.3.4 Equipment Blanks .............................................................................................14 <br /> 4.4 Data Validation..............................................................................................................14 <br /> 5. REPORTING AND SCHEDULE ..........................................................................................14 <br /> 6. REFERENCES.......................................................................................................................16 <br /> Investigation Work Plan—UST 817B ii December 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.