Laserfiche WebLink
a. ,. a <br /> gal ti <br /> .S <br /> i <br /> 917-01 <br /> 17-08 <br /> 9 :917-05 (4-14) <br /> „ (4�14) <br /> Building 917 <br /> 111 917-09 <br /> UST 81713-3 917-03 /(18-28) <br /> ♦ Tank 3 <br /> ♦— UST 817E-1 \917-10 <br /> n� "�r`m' • UST 817B-2 <br /> • 917-07 <br /> (18-28) - <br /> =�. • j <br /> Figure Extent <br /> ,, i 917=12 917-14 <br /> -28) <br /> nc_. �ci • 917-02 � _ <br /> Building 917 JC 'Q� <br /> Feet <br /> Al <br /> Legend <br /> Groundwater Monitoring Well —•— Fence 0 Former UST 917-01 — Well Name Notes: Site Layout <br /> Location 0 Building 917 Outline 0 Former Building Structures (4-14) — Screen Interval(ft bgs) ft bgs=feet below ground surface N UST 817E <br /> Former Excavation Area UST=underground storage tank Port of Stockton, Rough&Ready Island <br /> Drainage Channel -Aerial imagery source:Nearmap,June 2024. Stockton,California <br /> t — Suspected Excavation Based on <br /> Google Earth Images Circa 2010 <br /> Geosyntec Figure <br /> consultants <br /> 0 40 2 <br /> Feet WR2501 E November 2024 <br /> \\oakland-01\data\GIS\Port_Of_Stockton\Rough-and-Ready-Island-PM\Project\USTs\2024-07_UST817B\Figures.aprx\Fig02_SiteLayout 9/26/2024 11:47 AM(kwalton) <br />