My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2500864
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROUGH AND READY ISLAND
>
0
>
2900 - Site Mitigation Program
>
SR2500864
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 11:15:25 AM
Creation date
3/10/2025 4:06:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2500864
PE
2900 - Site Mitigation Program
STREET_NUMBER
0
STREET_NAME
ROUGH AND READY ISLAND
City
Stockton
Zip
95203
APN
16203007
CURRENT_STATUS
Pending
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
ROUGH AND READY ISLAND Stockton 95203
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency (USEPA) Low Stress (low flow) Purging and Sampling Procedure for the <br /> Collection of Groundwater Samples from Monitoring Wells(USEPA, 2017). Included in <br /> this SOP are the field forms for sampling,protocols and forms for meter calibration, and <br /> procedures for decontamination and documentation that will be followed. <br /> 1.2 Pre-Mobilization Activities <br /> Prior to mobilization to the Site,the sampler will obtain information on the construction, <br /> diameter, depth, material, and screen interval of the monitoring wells that will be <br /> sampled. and will obtain a map showing the location of each monitoring well to be <br /> sampled. <br /> The sampler will also obtain a listing of the parameters that will be measured in the field <br /> or laboratory as part of the sampling program including the required analytical method, <br /> sample volume, and holding time for each parameter. The parameters that will be <br /> measured in the field are the low flow stabilization parameters including temperature,pH, <br /> specific conductance, OR?, DO, and turbidity. These parameters will be recorded as <br /> required during low flow sampling, and immediately prior to collection of samples for <br /> laboratory analysis. <br /> 1.2.1 Equipment and Supplies <br /> The field equipment below will be brought to the site and used during sample collection: <br /> • Field sampling forms <br /> • Level D Personal Protective Equipment(PPE) <br /> • bladder pump <br /> • peri-pump (used only when bladder pump use not feasible due to the diameter of <br /> the well casing) <br /> • Field probe and flow-through cell (e.g., YSI) for measuring pH, temperature, <br /> conductance (and/or specific conductance), dissolved oxygen and oxidation- <br /> reduction potential of groundwater, and a turbidity meter. <br /> • Calibration solutions for the field probes <br /> • Water level meter <br /> • Tubing, connections and tools as appropriate <br /> • Decontamination supplies (e.g., deionized or distilled water, Alconox/Liquinox <br /> soap, alcohol,paper towels) <br /> • Sample containers and cooler provided by laboratory <br />
The URL can be used to link to this page
Your browser does not support the video tag.