Laserfiche WebLink
iota *!;qRS <br /> Final ELD Test Project Worksheet <br /> Final Test Date: 11/29/2023 IOTA Technicians: Sergio L.Nunez <br /> Site Information CGRS Project No: 61-27524 Installation Contractor Information <br /> Facility: Arco#7161 Customer Name: Town&Country Contractors <br /> Address: 1243 West March Lane Address: 3181 Luyung Dr.#A <br /> CRY,State,Zip: Stockton,CA 95207 City,State,Zip: Rancho Cordova,CA 95742 <br /> County: San Joaquin Contact: Mark Farmer <br /> CUPA Email: ust@sjgov.org Phone/Email: 916-636-9500/mark@tccontmctors.com <br /> TANKS <br /> Tank No. Capacity al. Product Type Manufacturer Brine Test Result <br /> Tankl 25,000 87 Octane DW Fiberglass CSI Yes PASS <br /> Ink 12,000 91 Octane DW Fiberglass CSI Yes PASS <br /> Tank 10,000 Diesel DW Fiberglass CSI Yes PASS <br /> COMPONENTS IN CONTAINMENT <br /> Tank Top Sums Diameter in. Depth In. Volume al. Description Test Result <br /> S1 48 60 470.01 87 TS PASS <br /> S2 42 60 359.86 87 FS PASS <br /> S3 48 60 470.01 91 TS PASS <br /> S4 42 60 359.86 91 FS PASS <br /> S5 48 60 470.01 DSL TS PASS <br /> S6 42 60 359.86 DSL FS PASS <br /> Junction Boxes with Tank Connection Description Test Result <br /> S1 TankProbe and Turbine J-Boz Open During Test PASS <br /> S3 Tank Probe and Turbine J-Boz Open During Test PASS <br /> S5 Tank Probe and Turbine J-Boz Open During Test PASS <br /> UDC. Length In. Width In. Depth in. Volume al. Description Test Result <br /> UDC1 42 22 32 128.00 Bravo PASS <br /> UDC2 42 22 32 128.00 Bravo PASS <br /> UDC3 42 22 32 128.00 Bravo PASS <br /> UDC4 42 22 32 128.00 Bravo PASS <br /> UDC5 42 22 32 128.00 Bravo PASS <br /> UDC6 42 22 32 128.00 Bravo PASS <br /> UDC7 42 22 32 128.00 Bravo PASS <br /> UDC8 42 22 32 128.00 Bravo PASS <br /> Transition Sump Length in. Width In. Depth In. Volume al. Descri ion Test Result <br /> TS1 24 22 32 73.14 Bravo PASS <br /> PIPING <br /> Product Piping Manufacturer Type Size in. Length ft. Test Result <br /> 87 PL NOV DW Fiberglass 2 320 PASS <br /> 91 PL NOV DW Fiberglass 2 380 PASS <br /> DSL PL NOV DW Fiberglass 2 230 PASS <br /> Verd Piping Manufacturer Type Size in. Len th ft. Tesl Result <br /> 87 Vent NOV DW Fiberglass 2 105 PASS <br /> 91 Vent NOV DW Fiberglass 2 160 PASS <br /> DSL Vent NOV DW Fiberglass 2 145 PASS <br /> Va or Piping Manufacturer Type Size in. Length ft. Tesl Result <br /> VR NOV DW Fiberglass 3 375 PASS <br /> Leak Logs/Repair <br /> 12/1/2023 {' d 06-1727 11/29/2023 <br /> Reviewed By Date IOTA TeA Signature CA License No. Date <br />