Groundwater Well Installation Work Plan Sharpe Army Depot <br /> Lathrop, California <br /> 3.2.1 Well Construction <br /> Well construction activities and materials will conform to the sections below. Special consideration and <br /> care will be taken during construction to ensure that the casing and screen are joined correctly and in a <br /> manner that does not place excess pressure or stress on each joint. Well construction diagrams for the <br /> extraction and monitoring wells are presented in Figures 9 through 11.The drilling subcontractor will have <br /> a State of California C-57 license, and a copy of the certificate will be kept onsite. <br /> Each well boring will be advanced to its total depth using a truck-mounted mud rotary or sonic drill rig. <br /> Before installation,the downhole equipment,tools, and well materials are freed of solvents, oils, grease, <br /> paint, and dirt. If the supervising Project Geologist determines that the well screen or casing is not clean, <br /> steam-cleaning of the drill bit and rods, well screen and casing, or other equipment and tools will be <br /> performed before installation. <br /> 3.2.1.1 Well Casing <br /> Blank well casing for extraction wells will be flush-threaded 8-inch diameter, Schedule 80 polyvinyl <br /> chloride (PVC). Blank well casing for monitoring wells will be flush-threaded 4-inch diameter, Schedule 40 <br /> PVC.Sections of casing will be received from the supplier in polyethylene protective wrappers with sealed <br /> ends to limit exposure to potential contaminants.The casing will not be removed from the wrapping until <br /> installation. After the borehole has been drilled to the proposed total depth, the well screen and casing <br /> will be lowered into the center of the borehole.The well screen and casing will be plumb and centered in <br /> the hole using centralizers placed at the top and bottom of the screened interval, as described below. <br /> The preliminary design for the proposed wells is as follows: <br /> • EWC6 and EWC7 (Table 1, Figure 9) <br /> o Blank casing from the ground surface to 112 ft bgs <br /> o Screened casing from 112 to 122 ft bgs <br /> o Blank casing sump from 122 to 127 ft bgs <br /> • EWC8 and EWC9 (Table 1, Figure 10) <br /> o Blank casing from the ground surface to 120 ft bgs <br /> o Screened casing from 120 to 130 ft bgs <br /> o Blank casing sump from 130 to 135 ft bgs <br /> • EWCC7 (Table 1, Figure 11) <br /> o Blank casing from the ground surface to 140 ft bgs <br /> o Screened casing from 140 to 150 ft bgs <br /> o Blank casing sump from 150 to 155 ft bgs <br /> • MW549C and MW550C(Table 1, Figure 12) <br /> o Blank casing from the ground surface to 100 ft bgs <br /> o Screened casing from 100 to 110 ft bgs <br /> • MW551B (Table 1, Figure 12) <br /> o Blank casing from the ground surface to 75 ft bgs <br /> o Screened casing from 75 to 85 ft bgs <br /> Ahtna Environmental,Inc. 10 <br />