Laserfiche WebLink
Aktnx Initial/Follow-Up QC Inspections <br /> Project Number <br /> Installation/Site QC Representative <br /> Event Name Date of Inspection(s) <br /> Item Number and Inspection Phase Inspect.Type[21 Basisi3i Variance Deficient Inspector <br /> (I/F)I" W S M/E P E/N/P/O (Y/N)[4 (Y/N)I" Initial/Time <br /> Details: <br /> Details: <br /> 7 <br /> Details: <br /> Details: <br /> Details: <br /> Details: <br /> Notes: <br /> [1] Phase:Initial(1);Follow-up(F) <br /> [2] Inspection Type:(W)Workmanship;(S)Safety;(M/E)Materials/Equipment;(P)Plan Compliance <br /> [3] Basis:(E)Existing DFOW or task;(N)New DFOW or task;(P)New personnel;(0)Other(specify) <br /> [4] Variance:Contact FTL/PL for variance approval,document resolution.Complete field form SWE-FFRM-004,"Work Variance"as directed by FTL.. <br /> [5] Deficiency:Contact FTL/PL before proceeding with work,note resolution.Complete field form SWE-FFRM-102,"Corrective Action"as directed. <br /> Approved By <br /> Initial Signature Date <br /> Ahtna Southwest Environmental SWE-FFRM-101(June 2022) Page of <br />