Laserfiche WebLink
Akt"' Aquifer Pumping Tests <br /> Project Number Extraction Well ID <br /> Installation/Site Observation Well ID <br /> Well Diameter(inches) Field Team Leader <br /> Maximum Drawdown (feet) Field Technician <br /> Screen Interval (btoc) and (Provide interval depths,screen specifications,where depth measurements are taken from if not the top of <br /> casing,and other relevant descriptions): <br /> Measuring Point <br /> Description <br /> Flow meter model Flow Meter S/N or ID <br /> (Observations) <br /> Field Measurements O Constant-Rate Pumping Test O Step-Drawdown Test <br /> Meter <br /> Date/Time of Elapsed Depth to Totalizer Pumping Comments <br /> Measurement Time Water Reading Rate <br /> (Record"Start Step##"for each step in the <br /> (mo/day hh:mm) (minutes) (ft bmp) (gpm) Step Drawdown Tests) <br /> Static DTW Measurement <br /> Ahtna Southwest Environmental Page 1 of SWE-FFRM 406.00(April 2023) <br />