Laserfiche WebLink
Soil Classification Standard Operating Procedure <br /> SWE-FSOP-201;Revision 0 Ahtna Southwest Environmental Operations <br /> 1.0 Introduction <br /> 1.1 Purpose <br /> This Standard Operating Procedure (SOP) establishes uniform guidelines and procedures for field <br /> personnel when completing descriptions of soil samples obtained during field sampling efforts and <br /> entering the information into soil boring logs. Standardization is important to minimize variations in <br /> evaluations among geologists, which is essential for creating consistency in subsurface interpretations. <br /> This procedure will be used during all field activities when borehole subsurface drilling, surface soil <br /> sampling, or reconnaissance geological mapping is performed.These activities should be documented as <br /> described herein and follow SWE-FSOP-001 (Field Documentation). <br /> 1.2 Scope <br /> The scope of this SOP is to describe the data entry requirements for logging the physical properties of soil <br /> using procedures modifed from, but generally consistent with American Society for Testing Materials <br /> (ASTM) Method D2488 (Visual-Manual Procedure). <br /> 1.3 Responsibilities <br /> Field Team. A Field Team is one or more individuals working together. The Field Team is responsible for <br /> the oversight of and/or collection of groundwater samples as specified in this SOP. <br /> Field Team Lead (FTL). The FTL is responsible for reviewing project work plans to understand the health <br /> and safety needs, procedural specifications,and field documentation requirements.The FTL is responsible <br /> for reviewing and confirming the adequacy of the fieldwork documentation. <br /> Geologist.The Geologist(who may also be the FTL) is responsible for performing or having oversight over <br /> Field Team members performing the same work. The Geologist is responsible for the accurate and <br /> complete representation of the lithology encountered in the field, as well as review and approval of final <br /> logs to be stored in project files and presented in client deliverables. <br /> Project Lead (PL). The PL is responsible for providing adequate resources to the field staff and ensuring <br /> the Field Team has adequate experience and training to comply with the SOP successfully. The PL is <br /> responsible for approving and documenting techniques not described in this SOP but are considered the <br /> best methods for the current project. <br /> Safety Representative. The Safety Representative meets the experience and training requirements of <br /> USACE EM-385-1-1 (USACE, 2014). The Safety Representative oversees site-specific health and safety <br /> activities and ensures compliance with the project requirements. The Safety Representative notifies the <br /> PL of safety deficiencies and incidents and actions to correct those. The PL approves those actions or <br /> notifies the Site Safety and Health Officer for their approval if the circumstance warrants involvement. <br /> Quality Control Lead(QC Lead).The QC Lead ensures work inspections are performed using the 3-Phases <br /> of Quality Control method described in the project work plans. The QC Lead notifies the PL of quality <br /> deficiencies and actions to correct those. The PL approves those actions or notifies the SWE Field QC <br /> Manager for their approval if the circumstance warrants involvement. <br /> Page 4 of 11 <br />