Laserfiche WebLink
Soil Sampling Field Standard Operating Procedure <br /> SWE-FSOP-405;Revision 1 Ahtna Southwest Environmental Operations <br /> • <br /> - Step, 5` <br /> 5.0 Quality Assurance/Quality Control <br /> Conduct the 3-Phases of Quality Control Method described in the project work plans. <br /> Quality Assurance (QA) and Quality Control (QC) procedures for soil sampling and field documentation <br /> review will be performed by the FTL or PL to check that procedures and documentation content and <br /> level of detail comply with this SOP. If a deficiency or a variance was taken to the SOP,the PL should <br /> document the deficiency/variance and determine the need for corrective action in coordination with the <br /> QA Manager. <br /> 6.0 Documentation Review <br /> The FTL is responsible for daily review of the activities performed at the site and fieldwork <br /> documentation for compliance with requirements (Section 4.0) and legibility. Errors and omissions <br /> should be explained and revisions to an entry signed and dated by the FTL. <br /> 7.0 References <br /> American Society of Testing and Materials (ASTM) Method D-1586. <br /> Interstate Technology& Regulatory Council (ITRC), 2012. Incremental Sampling Methodology Guidance. <br /> February. <br /> Page 15 of 15 <br />