My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
700
>
2900 - Site Mitigation Program
>
PR0542675
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 10:41:30 AM
Creation date
3/11/2025 2:50:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542675
PE
2954 - USEPA - SITE PROJECT
FACILITY_ID
FA0024553
FACILITY_NAME
SHARPE ARMY DEPOT
STREET_NUMBER
700
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
700 ROTH RD LATHROP 95330
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Groundwater Well Installation Standard Operating Procedure <br /> SWE-FSOP-601;Revision 1 Ahtna Southwest Environmental Operations <br /> • Unless otherwise specified, cement grouts should be mixed using approximately 6 to 7 gallons of <br /> water per 94-pound bag of Type 1/11 Portland cement to a density of approximately 15 <br /> pounds/gallon. <br /> • If needed, add bentonite (5 to 10 percent)to the cement grout to strengthen the mix and delay <br /> the setting time. <br /> • Specific mixtures and other types of cement and grout proposed should be evaluated on a case- <br /> by-case basis by the field geologist and communicated to the drillers. <br /> During grout installation, maintain the bottom of the tremie pipe below the top of the grout to prevent <br /> free fall and bridging. When using drive casing or hollow stem auger techniques, raise the drive <br /> casing/augers in short increments during grout pouring, keeping the bottom of the drive casing/augers <br /> below the top of the grout. It is essential to calculate the approximate volume of grout required; note <br /> reduced/excessive volumes, which may indicate irregularities in the annulus or grout flow into a <br /> formation. Cease grouting when the grout level has risen to approximately one to two feet of the ground <br /> surface, depending on the surface completion type (flush-mount versus aboveground). Monitor grout <br /> levels to ensure that grout taken into the formation is replaced by additional grout. If settling occurs, <br /> additional topping off of the grout may be necessary. <br /> 4.3.7 Protective Casing <br /> For aboveground completions, place the protective steel casing (e.g., lockable "stovepipe") over the top <br /> of the well casing and insert it into the freshly grouted annulus. Before installation, place a 2-inch thick <br /> temporary spacer between the PVC well cap and the bottom of the protective casing cover to keep the <br /> protective casing from settling onto the well cap. Note: confirm the final clearance required between the <br /> top of the well casing and the cover; additional room may be needed for dedicated well equipment. <br /> After the protective casing is set in the grout, a drainage hole may be drilled into the protective casing if <br /> required in project work plans. The drainage hole is positioned approximately two inches above ground <br /> surface. Paint the protective casing with rust-preventive colored paint. Make sure the well is protected <br /> from potential vapors from paint. <br /> Label the wellhead to provide information such as well number, depth, and date of the installation based <br /> on project requirements. <br /> Wait 24 hours after grouting before installing concrete pad and steel guard posts (bollards) for <br /> aboveground completions or street boxes or vaults for flush-mount completions. <br /> Aboveground Completions <br /> A concrete pad, usually 3-foot by 3-foot by 4-inch thick, is constructed at ground surface around the <br /> protective steel casing. The concrete is sloped away from the protective casing to promote surface <br /> drainage away from the well. <br /> Where traffic conditions warrant extra protection, embed three to four steel guard posts (bollards) to a <br /> depth approximately 1.5 feet below ground surface with three to four feet of stickup depending on project <br /> requirements. Install the posts in concrete-filled post holes spaced equally around the well, commonly at <br /> 1.5 feet from the protective steel casing (check work plan for exact specifications). Where posts are <br /> removed for well access, embed mounting sleeves into the concrete. <br /> Page 13 of 16 <br />