Laserfiche WebLink
Groundwater Well Development Field Standard Operating Procedure <br /> SWE-FSOP-602;Revision 1 Ahtna Southwest Environmental Operations <br /> 4.2.1 Site Preparation <br /> Before mobilizing, the logistics of well development, fluid containment, and site management should be <br /> determined.The site should be prepared as per the project work plans. <br /> • Appropriate barriers and markers should be in place prior to well development, as per the site <br /> health and safety plan <br /> • Plastic sheeting (e.g.,VisqueenT"") may be required beneath the rig <br /> • Appropriate IDW containment should be set onsite prior to the commencement of well <br /> development <br /> 4.2.2 Discussion of Site Conditions <br /> Before development operations begin,the following must be completed: <br /> • The FTL or designee should assess the well site with the driller. This assessment should identify <br /> potential hazards and determine how operations may impact the environment <br /> • As per the project work plans, potential hazards should be evaluated and corrected <br /> • Potential hazards should be evaluated and corrected <br /> • If hazard(s) (e.g., free product, vapors) may exist, the driller should be informed of the potential <br /> hazard(s) before starting work <br /> 4.2.3 Mobilization <br /> Once the site is prepared, the rig is mobilized and located over the groundwater well. <br /> • Level the rig with a set of hydraulic pads attached to the front and rear of the rig <br /> • Raise the mast slowly and carefully to prevent tipping or damaging the rig and avoid obstructions <br /> or hazards <br /> • Appropriate barriers and markers should be in place before drilling, as per the site health and <br /> safety plan <br /> 4.3 Development Procedures <br /> Perform well development as soon as practical after well installation, but in compliance with applicable <br /> state or local requirements for seal curing times, which may range from a minimum of 48 to 72 hours <br /> following well installation. <br /> [PFAS Project]:The cap and all internal components of the well casing above the water table shall be <br /> rinsed with PFAS-free water to remove all traces of soil, sediment, and cuttings, before and/or <br /> during well development. Dedicated materials shall be used for well development. <br /> Record details of development activities in the Well Development form (SWE-FFRM-402.00). <br /> 1. Measure and record the water level and total depth of the well using a water level indicator per <br /> SWE-FSOP-102 (Groundwater and NAPL Measurements). Note any accumulated sediment <br /> thickness, and record information in the FLB and on form SWE-FFRM-402.00(Well Development). <br /> 2. Begin well development by removing any accumulated sediment from the bottom of the well <br /> using the bailer. Repeat this process until as much accumulated sediment as possible has been <br /> removed from the bottom of the well. <br /> Page 9 of 11 <br />