Laserfiche WebLink
Equipment Decontamination Standard Operating Procedure <br /> SWE-FSOP-801;Revision 1 Ahtna Southwest Environmental Operations <br /> 4.7 Document Control <br /> After a task or project, all field documentation, including the field logbook/notepads, field forms, and <br /> electronic data,shall be scanned and placed on the server in the appropriate folder.All original documents <br /> shall be submitted to the PL and kept in the project file. See FSOP-001 (Field Documentation). <br /> 5.0 Quality Assurance/Quality Control <br /> Conduct the 3-Phases of Quality Control method described in the project work plans. <br /> 6.0 Documentation Review <br /> The FTL is responsible for the daily review of the fieldwork documentation for compliance with <br /> requirements (Section 4.0 "Procedures") and legibility. Errors and omissions should be explained and <br /> revisions to an entry signed and dated by the FTL. <br /> 7.0 References <br /> Not applicable. <br /> Page 10 of 10 <br />