My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
700
>
2900 - Site Mitigation Program
>
PR0542675
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 10:41:30 AM
Creation date
3/11/2025 2:50:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542675
PE
2954 - USEPA - SITE PROJECT
FACILITY_ID
FA0024553
FACILITY_NAME
SHARPE ARMY DEPOT
STREET_NUMBER
700
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
700 ROTH RD LATHROP 95330
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Investigation-Derived Waste Management Standard Operating Procedure <br /> SWE-FSOP-802;Revision 0 Ahtna Southwest Environmental Operations <br /> 5.0 Quality Assurance/Quality Control <br /> Conduct the 3-Phases of Quality Control method described in the project work plans. <br /> Quality Assurance (QA) and Quality Control (QC) procedures for IDW field documentation review will be <br /> performed by the PL and QC Manager to confirm that content and level of detail comply with the <br /> applicable planning documents. Identification of errors and corrections made during QA/QC reviews will <br /> follow documentation requirements described in SWE-FSOP-001 (Fieldwork Documentation). <br /> 6.0 Documentation Review <br /> The FTL is responsible for reviewing hazardous waste characteristics, ensuring the disposal facility is <br /> licensed to receive the IDW, and reviewing waste manifests and bills of lading. <br /> The FTL is responsible for the daily review of fieldwork documentation for compliance with <br /> requirements (Section 4.0) and legibility. Errors and omissions should be explained and revisions to an <br /> entry signed and dated by the FTL. <br /> 7.0 References <br /> None cited. <br /> Page 9 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.