My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
700
>
2900 - Site Mitigation Program
>
PR0542675
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 10:41:30 AM
Creation date
3/11/2025 2:50:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542675
PE
2954 - USEPA - SITE PROJECT
FACILITY_ID
FA0024553
FACILITY_NAME
SHARPE ARMY DEPOT
STREET_NUMBER
700
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
700 ROTH RD LATHROP 95330
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Standard Operating Procedure Page 3 of 6 <br /> SOP-011 Water Level Measurements in Monitoring Wells Revision No. 0 <br /> March 2020 <br /> permanently fixed structure or from ground level. The point of measurement should then be noted on <br /> the FADL and the appropriate form on which the water level is recorded. For flush mount completions, <br /> such as street boxes, the water level measurement should be referenced to a steel plate placed across <br /> the rim of the street box and over the casing.Any aboveground completions without permanent reference <br /> points or marks should be brought to the attention of the appropriate supervisory personnel per the <br /> project-specific work plans. <br /> Collect measurements until two consecutive measurements are identical or within the specified tolerance <br /> of the project-specific work plans (usually 0.01 ft). <br /> 4.6 Record <br /> Record all appropriate information on either the Water Level Measurement Form, Well Development <br /> Record, or the Sampling Information Form, depending upon the task being performed.At a minimum,the <br /> following information must be recorded: <br /> • Project name and number; <br /> • Unique well identification number; <br /> • Date and time of measurement collection; <br /> • Depth to water to the specified tolerance; <br /> • Weather conditions; and <br /> • Any problems encountered <br /> If product or other nonaqueous liquid is encountered,follow the procedures outlined in this SOP. <br /> 4.7 Post-Operation <br /> Cap and relock the well after measurements are complete. <br /> 5.0 Records <br /> Records generated as a result of this SOP will be controlled and maintained in the project records files. <br /> Sharpe Army Depot <br />
The URL can be used to link to this page
Your browser does not support the video tag.