Laserfiche WebLink
Groundwater Well Installation Work Plan Sharpe Army Depot <br /> Lathrop, California <br /> Reviewer Nadia Hollan Burke organization Environmental Protection Agency Date April 4, 2023 <br /> Item Reference Review Comment Response <br /> 4. Section 3.2.1.3, The text states that the sounding pipe ends will be sealed Revised. Section 3.2.1.3 has been revised to state that the <br /> Sounding Pipe, with polyethylene wrapping and the wrapping will be pipe will not be removed from the wrapping until <br /> Page 11 removed after installation; however, it is unclear how the installation. <br /> wrapping will be removed if both ends are sealed when <br /> the pipe is placed. Please elaborate on how the wrapping <br /> will be removed or revise this section to state the <br /> wrapping will be removed prior to installation of the <br /> sounding pipe. <br /> 5. Section 3.2.2, The text states well development will be complete when Revised. Section 3.2.2 has been revised to state, "Water <br /> Well all visible sediments have been removed and groundwater will be removed from the well using a submersible pump <br /> Development, quality parameters (temperature, dissolved oxygen, until field-measured water quality parameters have <br /> Page 13 oxidation reduction potential, pH and conductivity) have stabilized, or until at least ten well volumes are removed <br /> stabilized in a reasonable amount of time and a senior (DTSC, 2014)." <br /> geologist will be consulted; however, a reasonable <br /> amount of time is not defined and it is not clear how <br /> development will be completed if the time required <br /> exceeds a reasonable amount. Please define what a <br /> reasonable amount of time is and consider including a <br /> contingency if stabilization is not met in this timeframe. <br /> 6. Section 3.2.7, The text states soil samples will be collected and logged Clarification. Proposed well locations and screen intervals <br /> Sampling, by a qualified geologist for lithology; however,the text are based on data collected from the Groundwater <br /> Page 17 does not state if soil will be evaluated for contamination Monitoring Program. Discrete soil sampling will be used for <br /> including screening with a photoionization detector(PID), logging purposes only and to select the final screen depth. <br /> which may provide additional information for well screen No edits to the text were made. <br /> placement. Please consider evaluating retrieved soil for <br /> volatile contamination. <br /> 7. Table 1, The extraction well and well construction details Revised.Table 1 was revised to reflect the correct well <br /> Specifications (estimated borehole depth, screen slot size, and screen intervals. <br /> for Proposed estimated screened interval) in Table 1 are inconsistent <br /> Groundwater with the text. For example,Table 1 indicates the <br /> Ahtna Environmental Inc. Page 2 of 6 <br />