My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
700
>
2900 - Site Mitigation Program
>
PR0542675
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 10:41:30 AM
Creation date
3/11/2025 2:50:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542675
PE
2954 - USEPA - SITE PROJECT
FACILITY_ID
FA0024553
FACILITY_NAME
SHARPE ARMY DEPOT
STREET_NUMBER
700
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
700 ROTH RD LATHROP 95330
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Groundwater Well Installation Work Plan Sharpe Army Depot <br /> Lathrop, California <br /> Reviewer Carla Landrum Organization Central Valley Water Board Date April 6, 2023 <br /> Item Reference Review Comment Response <br /> the proposed extraction wells have not been added for the <br /> reason stated in the reponse to General Comment 3. <br /> 6. Please discuss how the vertical placement of proposed Clarification.As noted in the response to General <br /> extraction wells will not increase the extent of plume Comment 5, since the proposed well locations do not <br /> migration, which appears to be the case by intersect the cross-section lines directly(Figure 2), it can be <br /> consequence of EWCC7 placement in Figure 3. difficult to interpret a well location in relation to the <br /> plume. Figures 3-5 should be used in conjunction with <br /> Figures 6 and 8, as well as Table 2 to gain a better <br /> understanding of well locations in relation to the plume. As <br /> illustrated by Figures Al-A6,the proposed location of <br /> EWCC7 is expected to improve plume capture and limit <br /> migration by partially filling an existing gap in the <br /> extraction well network. <br /> 7. In instances where there is insufficient data to estimate Revised. Figures 6, 7, and Al-A6 have been revised to <br /> the location of a plume boundary, such as the include a dashed line to indicate estimated plume <br /> southernmost TCE plume extent shown in Figure 7,the boundaries. <br /> plume boundary should by symbolized by a dashed line. <br /> Please update Figure 7, and elsewhere as necessary, to <br /> accurately depict plume extent(s) in the Work Plan. <br /> 8. Please make sure well construction specifications are Revised. Figure 9 has been revised to indicate the grout <br /> clear and accurate. For example, in Figure 9, grout from 0-106 feet. <br /> placement is shown from 0 feet— 109 feet yet the <br /> bentonite seal is shown from 106 feet— 109 feet. <br /> 9. Appendix C Please include all relevant SOPS. For example, the Revised. Updates of all applicable SOPs have been added <br /> contents of SOP No. 003 and SOP No. 008 are not to Appendix C, and the text has been revised to specify <br /> readily identified within the Work Plan. low-flow sampling in Section 3.2.7. <br /> Ahtna Environmental Inc. Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.