My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MYRTLE
>
2849
>
2300 - Underground Storage Tank Program
>
PR0538822
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2026 8:07:08 PM
Creation date
3/12/2025 1:33:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0538822
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0022301
FACILITY_NAME
Regional Transportation Center
STREET_NUMBER
2849
Direction
E
STREET_NAME
MYRTLE
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15702011
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2849 E Myrtle ST Stockton 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />8. SUMPIUDC TEST <br />Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br />Test Equipment Used: <br />Sump/UDC ID <br />87 Fill <br />Diesel STPITank 2 <br />Sump Manufacturer <br />Sump Manufacturer <br />Containment <br />Containment Solution <br />Sump Depth (inches) <br />Sump Depth (inches) <br />NIA <br />NIA <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(Inches) <br />NIA <br />NIA <br />Test Start Time <br />Test Start Time <br />0 <br />0:0 <br />Initial Reading <br />Initial Reading <br />2 PSI <br />2 PSI <br />Test End Time <br />Test End Time <br />60 mins <br />60 mins <br />Final Reading <br />Final Reading <br />2 PSI <br />2 PSI <br />Change in Reading <br />Change in Reading <br />0 <br />0 <br />Pass/ ail Criteria <br />ass ail Criteria <br />Pass <br />Pass <br />Tightness Test Results <br />❑ Pass ❑ Fail <br />Tightness Test Results <br />13 Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Sump1UDC ID <br />Sump Manufacturer <br />Sump Depth (inches) <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />Test Start Time <br />Initial Reading <br />Test End Time <br />Final Reading <br />Change in Reading <br />Pass/ ail Criteria <br />Tightness Test Results <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Additional copies of this page may be attached. <br />All tests marked "Fail' and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 3of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.