Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> I <br /> Date site plan was prepared. <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> -. <br /> UST Monitoring Site Plan } <br /> `,te 4dd+ess 6131 PACIFIC AVENUE STOCKTON CA i <br /> 77 Fir <br /> . . . . . . <br /> . O L <br /> . O <br /> O <br /> . . . . . . . 00 <br /> DIE ' t. <br /> KEY . . . . . I . . . . . . . . . . . . O <br /> .A=ANNULAR Sensor . . . . . . . . . . . . . <br /> F=FILLS . . . . . . . . . . ll. <br /> V=VAPOR <br /> P=PROBE . . . . . . . . . . . . . t <br /> L=Turbine/Leak Detector . . . . . . - - . I 1 - - - 1 <br /> S=SUMP SENSOR - - . . . . . . . . . . . .. . . . <br /> "PIPING <br /> B=Brine Sensor . . . . . . . . . . . . . . . . . . . Drawing of pipm,, <br /> S=Stuart Sensor . . . . . . CAS exit of sump and <br /> C=Ffoals&Chains UDC's.No <br /> E=ES underground <br /> PACIFIC AVENUE S <br /> drawing is <br /> accurate,we <br /> AnF items utuletXnnind that am not risible/it the certi(wng technician arc a cannot speculate <br /> prglessional opinion tm/r an</are salchbr inliormanonal purpivev. Ormi-ing blue penis. <br /> ;at to scale <br /> Date map was drawn:8/11/21 <br /> Instructions <br /> If you already have a diagram that shows all required Information,you may include it.rather than this page,will,your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 ?Q I/07 <br /> Page 6 of 6 <br />