My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6131
>
2300 - Underground Storage Tank Program
>
PR0231223
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2026 10:26:26 AM
Creation date
4/2/2025 9:00:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231223
PE
2361 - UST FACILITY
FACILITY_ID
FA0002324
FACILITY_NAME
PACIFIC AVE
STREET_NUMBER
6131
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09746418
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
6131 PACIFIC AVE STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> I <br /> Date site plan was prepared. <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> -. <br /> UST Monitoring Site Plan } <br /> `,te 4dd+ess 6131 PACIFIC AVENUE STOCKTON CA i <br /> 77 Fir <br /> . . . . . . <br /> . O L <br /> . O <br /> O <br /> . . . . . . . 00 <br /> DIE ' t. <br /> KEY . . . . . I . . . . . . . . . . . . O <br /> .A=ANNULAR Sensor . . . . . . . . . . . . . <br /> F=FILLS . . . . . . . . . . ll. <br /> V=VAPOR <br /> P=PROBE . . . . . . . . . . . . . t <br /> L=Turbine/Leak Detector . . . . . . - - . I 1 - - - 1 <br /> S=SUMP SENSOR - - . . . . . . . . . . . .. . . . <br /> "PIPING <br /> B=Brine Sensor . . . . . . . . . . . . . . . . . . . Drawing of pipm,, <br /> S=Stuart Sensor . . . . . . CAS exit of sump and <br /> C=Ffoals&Chains UDC's.No <br /> E=ES underground <br /> PACIFIC AVENUE S <br /> drawing is <br /> accurate,we <br /> AnF items utuletXnnind that am not risible/it the certi(wng technician arc a cannot speculate <br /> prglessional opinion tm/r an</are salchbr inliormanonal purpivev. Ormi-ing blue penis. <br /> ;at to scale <br /> Date map was drawn:8/11/21 <br /> Instructions <br /> If you already have a diagram that shows all required Information,you may include it.rather than this page,will,your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 ?Q I/07 <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.