My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
2440
>
2300 - Underground Storage Tank Program
>
PR0527629
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2026 2:18:22 PM
Creation date
4/3/2025 9:30:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0527629
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0018721
FACILITY_NAME
COSTCO WHOLESALE #1031
STREET_NUMBER
2440
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2440 DANIELS ST MANTECA 95337
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTE: For additional information, refer to the Defender Series° Overfill Prevention Valve <br /> Installation Guide. <br /> 1. Determine Dimension A: <br /> • Measure from bottom of the tank to the top of OPW face seal adaptor in the OPW spill <br /> container. <br /> 2. Determine Dimension X: <br /> • Measure required length for the upper drop tube from the non-flanged end. <br /> • Remove the flanged top. <br /> • Follow steps 3 to 16 in OPW 71SO Installation & Maintenance Instructions (H15524PA) <br /> referenced in Executive Order VR-102 to cut the upper drop tube and install the OPW <br /> inlet tube. <br /> 3. Remove the flanged top of the upper drop tube. <br /> X <br /> OPERATIONAL INSPECTION <br /> Use the FFS remote test tool to inspect the OPV. <br /> 1. Assemble the remote test tool with enough extension sections to reach the OPV. <br /> 2. Insert the remote test tool into the drop tube. You should feel a "pull" when the magnets <br /> are positioned correctly and attract. <br /> 3. Slowly raise the remote test tool about 1'/z" (38 mm). You should see the flapper move into <br /> the flow path. If you see the flapper moving back and forth, the OPV is functioning normally. <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.