My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2026 8:52:53 PM
Creation date
4/3/2025 3:39:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231923
PE
2361 - UST FACILITY
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1617 W FREMONT ST STOCKTON 95203
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix B <br /> 71 SO Overfill Valve in Tank Initial Shut off Level Worksheet <br /> Important: This is meant to be supplemental Worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are 1n inches, Please contact the Authority Having Jurisdic- <br /> tion(AHJ)and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region,as well as take into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- <br /> stalled in the tank: <br /> Distance from the 71 SO inlet tube flange to the cast <br /> lug in the 71 SO body(see figures),upper tube length. <br /> Note: the Upper Tube Length must be at least 16"to in- <br /> clude the protective bend in the tube. <br /> (D) -- <br /> ❑istance from the 71 SO inlet tube flange to the top and <br /> bottom of lob+ r tube,valve length. (Dl <br /> (1Nl= Upper <br /> (U)= Tune <br /> Distance from the 71 SO inlet tube flange to the bottom <br /> of the tank. Note:If a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension <br /> (OPW 611.1 &61TP models add 0.6") (W)Valve <br /> Length, <br /> bottom of <br /> From the tank calibration chart provided by tank mane- cut <br /> facturer find the dipstick number(Y)which corresponds <br /> to the 100%vol ume. (8) <br /> M To Tank <br /> M <br /> 1. To determine shut-off percentage: Tank <br /> Subtract upper tube length(D)from distance to tank (U)Valve Chart <br /> bottom(B) Length, 100% <br /> W=(Bl-(D)-2"_ '�'l;.g � top of cut Volume <br /> Dipstick <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal- <br /> culated(X)dimension and the 100%volume(Y)tank <br /> capacity. <br /> (X)tank capacity in gallons= l 0ygQ 3 <br /> (Y)tank capacity in gallons= — <br /> 4 <br /> SO%=(XI capacity/JY)capacity x100��� <br /> Rote: The overfill valve must be installed per AM require- <br /> ments and all applicable local,state,and national codes. If <br /> the overfill valve is set above the allowable shut-off percent- <br /> age the overfill valve must be removed and replaced. For <br /> reference 40 CFR part 280 Subpart B Section 280.20 overfill <br /> valves should be set to a maximum of 95%. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.