My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2026 8:17:42 PM
Creation date
4/3/2025 3:39:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0523684
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
RD
City
Lathrop
Zip
95330
APN
19602020
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
116 Roth RD Lathrop 95330
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Overfill Prevention Equipment Inspection Report <br />Additional copies of this page may be attached. <br />Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br />Page 2 of 2 <br />6. OVERFILL PREVENTION EQUIPMENT DETAILS <br />Tank ID (one OPE per column) <br />Are both vent and tank riser piping <br />secondarily contained? <br />Yes <br />No <br />Yes <br />No <br />Yes <br />No <br />Yes <br />No <br />OPE Model <br />What is the OPE response when activated? <br />(Check all that apply.) <br />Shut off <br />Flow <br />Restricts <br />Flow <br />Audible <br />Alarm <br />Visual <br />Alarm <br />Shut off <br />Flow <br />Restricts <br />Flow <br />Audible <br />Alarm <br />Visual <br />Alarm <br />Shut off <br />Flow <br />Restricts <br />Flow <br />Audible <br />Alarm <br />Visual <br />Alarm <br />Shut off <br />Flow <br />Restricts <br />Flow <br />Audible <br />Alarm <br />Visual <br />Alarm <br />Are flow restrictors installed on vent piping <br />that may interfere with the OPE operation? <br />Yes* <br />No <br />Yes* <br />No <br />Yes* <br />No <br />Yes* <br />No <br />At what level in the tank is the OPE set to <br />activate? (Inches from bottom of tank) <br />What is the percent capacity of the tank at <br />which the OPE activates? <br />Is the OPE in proper operating condition to <br />respond when the stored substance <br />reaches the designated regulatory level? <br />Yes <br />No <br />Yes <br />No <br />Yes <br />No <br />Yes <br />No <br />7. SUMMARY OF TESTING RESULTS <br />OPE Inspection Results Pass <br />Fail <br />Pass <br />Fail <br />Pass <br />Fail <br />Pass <br />Fail <br />1 <br />8. COMMENTS <br />Describe all results marked Fail and each proposed remedy. <br />* Mark here if: <br />Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> <br />T-2 Premium T-3 Diesel
The URL can be used to link to this page
Your browser does not support the video tag.