My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2026 2:09:55 PM
Creation date
4/3/2025 3:39:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0523684
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
RD
City
Lathrop
Zip
95330
APN
19602020
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
116 Roth RD Lathrop 95330
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Product: Unleaded <br /> Appendix B <br /> 71 SO Overfill Valve in Tank Shut off Level Worksheet <br /> Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion (AHJ)and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region,as well as take into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- <br /> stalled in the tank: <br /> Distance from the 71 SO inlet tube flange to the cast <br /> lug in the 71 SO body(see figures), upper tube length. <br /> Note: the Upper Tube Length must be at least 16"to in- <br /> clude the protective bend in the tube. <br /> (D)= 67.00" to <br /> Distance from the 71 SO inlet tube flange to the top and <br /> bottom of lower tube,valve length. r <br /> (W)= 171.50" (D) <br /> (U) = Upper <br /> ---- Tube <br /> Distance from the 71 SO inlet tube flange to the bottom <br /> of the tank. Note: If a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension <br /> (OPW 6111 &61TP models add 0.6") (W)Valve <br /> (B) = 175.50" --- Length, <br /> bottom of <br /> From the tank calibration chart provided by tank manu- cut <br /> facturer find the dipstick number(Y) which corresponds <br /> to the 100%volume. (B) <br /> M = 119.75" ---- To Tank <br /> (Y) <br /> 1. To determine shut-off percentage: Tank <br /> Subtract upper tube length (D)from distance to tank (U)Valve Chart <br /> bottom (B) Length, 100% <br /> (X)=(B)-(D)-2"= 106.50" — --- top of cut Volume f <br /> Dipstick J <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal- <br /> culated (X) dimension and the 100%volume(Y)tank <br /> capacity. <br /> (X)tank capacity in gallons= 18861 --- <br /> (Y)tank capacity in gallons=19951— <br /> SO%= (X)capacity/(Y)capacity x100= 94.53% <br /> Note: The overfill valve must be installed per AHJ require- <br /> ments and all applicable local,state,and national codes. If <br /> the overfill valve is set above the allowable shut-off percent- <br /> age the overfill valve must be removed and replaced. For <br /> reference 40 CFR part 280 Subpart B Section 280.20 overfill <br /> valves should be set to a maximum of 95%. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.