Laserfiche WebLink
z <br /> S A N J 0 A Q U I N Environmental Health Department <br /> Q <br /> COUNTY Jasjit Kang, REHS, Director <br /> `9 oR �,r eu t n e s s y ro ws here. Muniappa Naidu,REHS,Assistant Director <br /> PROGRAM COORDINATORS <br /> Jeff Carruesco,REHS,RDI <br /> Willy Ng,REHS <br /> Steven Shih, REHS <br /> Elena Manzo, REHS <br /> Natalia Subbotnikova, REHS <br /> May 27, 2025 <br /> Carrie Miller <br /> Elite IV Contractors <br /> 2535 Wigwam Dr. <br /> Stockton, CA 95205 <br /> carrie(a),eliteiv.com <br /> UST RETROFIT — FULL PERMIT APPROVAL <br /> Re: Jamar Service SR2501116 <br /> 4075 E. Main St., Stockton, CA 95215 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of the <br /> application for a permit to do the following on the underground storage tank (UST) system at the above <br /> noted address: <br /> • replace the direct-bury 91 spill container <br /> The permit has been approved with the following conditions: <br /> 1. Contact the local fire district, the San Joaquin Valley Air Pollution Control District, and the local <br /> community development department for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for written approval <br /> prior to commencing work. All new submittals supersede previous ones. <br /> 3. Email notification to ust(cDsigov.org to arrange the following inspection appointments. <br /> All appointments must be scheduled at least 48 hours in advance. <br /> a. Spill bucket corrosion protection: Verify corrosion protection for direct bury spill bucket prior <br /> to backfilling. <br /> b. Spill bucket test, after concrete has set: Verify minimum 5-gallon capacity. Pass a one hour <br /> hydrostatic test (or equivalent). Verify proper drainage method. <br /> c. Since concrete will be broken near the 91 tank, a secondary containment test must be <br /> performed on the 91 tank once concrete is poured in accordance with the manufacturer's <br /> guidelines. <br /> The facility cannot receive fuel in the 91 tank prior to the EHD inspection and approval. <br /> 4. Any individual installing underground storage systems or components must possess, or work <br /> under the direct and personal supervision of an individual physically present at the work site at <br /> all times while work is being performed who possesses, all of the following: <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/ehd <br />