Laserfiche WebLink
TYPE CyF UNDERGROUND STORAGE TANK <br /> ACT'oN RESPONSE PLAN—PAGE I (one form per facility) <br /> ❑ I.NEW pt_ <br /> FACI1.1')1• AN 20 2.CHANGE OF INFORMATION Rol, <br /> BUS1N1 ,S # (Agency Use pn1Y) I. FACILITY INFORMATION i <br /> QUIK STOE(Same as I ACCLITY NANJI,) - - 1 R . <br /> BUSINESS SI P MARISET# 132 <br /> 3555 W.Hammer f <br /> Re, crry RW. <br /> Lane Stockton <br /> This plan addre II. SPILL CONTROL AND CLEANUP METHODS <br /> Business PI sses unauthorized releases from IJST'systems and supplements tic emergency response plans and procedures in the facility's Hazardous Materials <br /> re safe to do so,facility personnel will take immediate measures to control or sto an release fc. aclivalc um shut-off,etc.)and,if necessary,safe) remove <br /> remaining hazardous material from the UST system. p y €• P p• rY• Y <br /> Any release to secondary containment will he pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency- Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which <br /> it is non- is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR 262.11 rinds that <br /> ardous. Used absorbent material, reusable or waste,will be stored in a property labeled and scaled container.! §66aste material shall be disposed <br /> appropriately. <br /> Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity,has been in contact with any <br /> hazardous material.If the water is contaminated.it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems. <br /> We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1, Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment: <br /> 2, Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the producdwasic stored in the primary containment system,is placed inside secondary containment to treat or neutralize <br /> released product/wasie,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies arc replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED. (Complete only if applicable) <br /> EQUIPMENT LOCATION I AVAILABILITY <br /> R M R20. I R30- <br /> R 11. R21. R31. <br /> R 12- R22. R32. <br /> R 13. R23. R33. <br /> R14. R24. Rid. <br /> R 15. R25. R35. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Rao. TITLE R50. _ <br /> Martin Hilfin er Vice President Environmental Affairs <br /> NAME R41. TITLE RS 1. <br /> eS. Pfeifer Senior Manager of Environmental Operations <br /> NAME R42. TITLE R52 <br /> ason McCain Director Facilities Support Services <br /> NAME, R43. TITLE R53. <br /> Satwinder Singh District Manager <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ®Additional system testing or data collection ®Inspection by qualified persons ®Recalibration of equipment <br /> Other: <br /> Follow the steps on the accompanying"Simplified Response Plan for the Removal of an Unauthorized <br /> Release From the Interstitial Space of Double-Containment UST Systems." <br /> R00. <br /> US f Response Plan(12/2010)-1/3 <br />