My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
120
>
2300 - Underground Storage Tank Program
>
PR0515365
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2026 8:35:51 PM
Creation date
4/11/2025 2:42:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0515365
PE
2361 - UST FACILITY
FACILITY_ID
FA0012107
FACILITY_NAME
A TEICHERT & SON INC*
STREET_NUMBER
120
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
APN
19342006
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
120 FRANK WEST CIR STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Service Service Station Systems, Inc. QUOTATION <br /> Station 680 Quinn Ave <br /> Systems, Inc. DATE: 09/19/25 <br /> San Jose, CA 95112 QUOTE: 105532 <br /> CCB#485184 (408) 971-2445 EXPIRE DATE: 12/19/2025 <br /> To: Teichert Construction <br /> P.O. Box 15002 Sacramento, CA 95851 <br /> Attn: Nic Armstrong <br /> Subject: Overfill Prevention Repairs-Teichert- Stockton <br /> Site: 4 - 120 Frank W Circle, Stockton, CA <br /> Project: Install shut off valve on waste oil tank <br /> Complete overfill prevention inspection with inspector <br /> PO Num: <br /> DETAILED SCOPE OF WORK <br /> Set all drop tube to 92% <br /> Obtain permits as required <br /> Order and receive all equipment <br /> Complete notification to proper CUPA <br /> Travel to site <br /> Complete site introductions and safety paperwork. <br /> Waste Oil Tank-Remove current drop tube <br /> Waste Oil Tank-Build and install new drop tube, includes cutting and threading new 2"drop pipe if required. <br /> Complete overfill inspection on drop tube <br /> Travel from the site <br /> Submit results to proper CUPA <br /> EXCLUSIONS <br /> Permit and permit conditions <br /> Replacement parts to anything not described or provided in bid <br /> Return trip for inspections/inspector(assumes to be completed same day) <br /> Customer is required to provide tank charts <br /> If bucket needs to be removed, change order will be required and approved before proceeding <br /> Assumes drop tube will come out and go in. <br /> If permit conditions require inspector onsite for monitoring certification, assumes will be completed same day. Return trip for inspections is <br /> out of scope. <br /> Excludes any repairs/replacement of any equipment. <br /> Product lines have been fully purged and dispensers are in full manual operation <br /> Assumes tanks are below grade for gravity drop of fuel (if required for fuel transfers) <br /> Excludes any core value charge for parts and installation items that are provided by SSS, all charges will be responsibility of the customer <br /> Excludes any repairs to any other equipment or parts except as listed above <br /> SSS will not be responsible for site lost revenue for any reason <br /> All work to be performed during regular and routine business hours <br /> Any work performed after-hours for any reason will be charged premium rates <br /> EXCLUDES cost and acquisition of permits-service avail at Time&Materials <br /> Terms and conditions of the permit may significantly alter work scope and pricing <br /> Removal or disposal of contaminated materials <br /> EXCLUDES Site Image(decals, advertising signs, lighting, etc.) <br /> Excludes Cold Start and Monitoring certification if needed <br /> Any hardware/software issues with pre-existing equipment will be billed at T&M <br /> Any return trips needed due to network being offline or network issues will be billed at T&M <br /> Any return trips needed due to equipment not on site or missing will be billed at T&M <br /> Any communication cabling over 7 feet that is not provided by the customer <br /> Excludes drum for hanging hardware disposal (assumes on is on site) <br /> MATERIAL <br /> 1 - Universal 2" NPT Overfill Valve-Waste Oil Tank <br /> 1 -2"black pipe for drop tube <br /> Misc. Safety Equipment(barricades, gloves, caution tape, etc.) <br /> Misc. Installation Equipment(grease, screws, etc.) <br /> Initial 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.