Laserfiche WebLink
2 spotters observed on the tipping floor with appropriate personal protective equipment.7. <br />Reviewed log of special occurrences, load check records, training and daily tonnage and <br />vehicle counts. <br />8. <br />Submit 1 st quarter SB1383 measurements. 9. <br />Per Kurt, the facility anticipates starting up the food waste processing equipment by the <br />end of summer. They will notify the LEA prior to start-up. <br />10. <br />Attachments <br />Inspection Photos <br />Transfer/Processing Facility Inspection Report (53) <br />Tracy Material Recovery & T.S. (39-AA-0024) <br />4/16/2025 <br />CalRecycle Solid Waste Information System (SWIS)Page 2 of 2 <br />Date Generated: April 30, 2025 12:57 PM