My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
141
>
2300 - Underground Storage Tank Program
>
PR0543574
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2026 9:33:00 PM
Creation date
5/2/2025 11:16:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0543574
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0024750
FACILITY_NAME
Harney Lane 76
STREET_NUMBER
141
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
141 E HARNEY LN LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Monitoring System Certification Form <br />S. IN -TANK GAUGING TESTING <br />E) Check this box if tank gauging is used only for inventory control, <br />El Check this box if NO tank gauging equipment is installed, <br />o not coTplete this section if either box is checked, j <br />All wiring has been: 1) visually inspected for kinks, breaks and proper entry and <br />termination, and tested for ground faults? <br />Were all in -tank gauging probes visually inspected for damage and residue buildup <br />to ensure that floats move free l , functionally tested. and confirmed a p eration aI? <br />Yes <br />No <br />NA <br />� <br />� <br />❑ <br />❑ <br />Was accuracy of system's product level readings tested? _-- <br />❑ <br />❑ <br />❑ <br />❑ <br />Was accuracy of system's water level readings tested? <br />❑ <br />❑ <br />fere all probes reinstalled properly? <br />� <br />❑ <br />❑ <br />Were all items on the equipment manufacturer's <br />maintenance checklist completed? <br />❑ <br />67 <br />'robe !D <br />Probe Model <br />Tanks Monitored <br />Pass <br />Fail <br />❑ <br />❑ <br />17 <br />rl <br />-- <br />❑ <br />❑ <br />❑ <br />❑ <br />9. MMENTS <br />d Describe al/ answers marked "No" or "Fart" and proposed remedy. - <br />List all monitoring equipment either replaced or repaired. <br />Page 5 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.