My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
713
>
2300 - Underground Storage Tank Program
>
PR0521604
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2026 8:43:04 PM
Creation date
5/2/2025 11:46:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0521604
PE
2371 - UST FACILITY - 1702 COMPLIANT
FACILITY_ID
FA0014678
FACILITY_NAME
NASHIR EL DORADO INC
STREET_NUMBER
713
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13905214
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
713 N EL DORADO ST STOCKTON 95202
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11101011mmsef Woe <br /> mom Staffon Compliance Dept. <br /> NE"M %ab, 680 Quinn Ave <br /> San Jose,CA 95112 <br /> L 01 ma, Ino. 408-213-6039-Office <br /> 408-213-6026-Fax <br /> November 14,2025 <br /> To: San Joaquin County EHD <br /> Fr: Christina Tran,Service Station Systems/Able Maintenance, Inc. <br /> Re: Poppy Markets; 713 N El Dorado St, Stockton; dispenser replacement <br /> I am enclosing the application and other required documents for the replacement of six <br /> Gilbarco Encore dispensers to Wayne Ovation 2 dispensers at the above listed site. <br /> Bravo universal conversion frame will be installed for the new dispensers. <br /> There is no change proposed for the EVR Phase I system. However,the Phase II system <br /> will be converted from Healy Vac Assist to VST Balance There are no proposed changes <br /> to the building,canopy,tanks, lines, signage or monitoring system. A cold start of the <br /> monitoring system is necessary to update ISD software to latest(336.02) version. <br /> Technicians from Service StationSystems, Inc and Able Maintenance, Inc will be <br /> working together on this project. <br /> If you require any additional information or have any questions,please call me. Please <br /> send or email the permit to me at the address below. <br /> Thank you for your help in this matter. Your prompt consideration of this matter is <br /> greatly appreciated. <br /> SincerYl <br /> RECEIVED <br /> Christina Tran NOV 17 2025 <br /> Project and Permit Coordinator <br /> Service Station Systems Inc./Able Maintenance Inc. ENVIRONMENTAL HEALTH <br /> 680 Quinn Ave, San Jose,CA 95112 PERMIT/SERVICES <br /> (408) 213-6038 <br /> christinat(rijservicestations vstems.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.