Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) T1- 87 _ T2-91 T3-Diesel <br /> Are both vent and tank riser piping secondarily El Yes ❑ Yes El Yes ❑ Yes <br /> contained? ® No Z No ® No ❑ No <br /> OPE Model 61 SO 61 SO 61 SO <br /> What is the OPE response when activated? ® Shut off ® Shut off ® Shut off ❑ Shut off <br /> (Check all that apply.) Flow Flow Flow 1 Flow <br /> ❑Restricts ❑Restricts ❑Restricts ❑Restricts <br /> Flow Flow Flow Flow <br /> ❑ Audible ❑ Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑ Visual ❑ Visual ❑ Visual 1 ❑ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping that ❑ Yes* ❑ Yes* ❑ Yes* ❑ Yes* <br /> may interfere with the OPE operation? ® No 1 ® No ® No ❑ No <br /> At what level in the tank is the OPE set to 1 <br /> activate? (Inches from bottom of tank) 83" 33" 72" <br /> What is the percent capacity of the tank at <br /> which the OPE activates? 95% 95% 84% <br /> Is the OPE in proper operating condition to ® Yes El Yes ® Yes ❑ Yes <br /> respond when the stored substance reaches the ❑ No El No El No El No <br /> designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ®Pass KPass ®Pass El Pass <br /> ❑Fail ❑Fail ❑Fail ❑Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail'and each proposed remedy. <br /> * Mark here if: <br /> ❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />