Laserfiche WebLink
-3- <br /> PA-2400461 (Z) <br /> 8) A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 9) This project is subject to the NPDES Region-Wide Permit requirements and shall comply <br /> with the following conditions. Prior to release of the building permit, plans and calculations <br /> shall be submitted and approved by the Public Works Department—Water Resources <br /> Division (209-468-9360 or 209-468-9596): <br /> a) Treatment: A registered professional engineer shall design the site to treat the 85th <br /> percentile storm as defined in the County's 2023 Storm Water Quality Control Criteria <br /> Plan (SWQCCP). <br /> b) Hydromodification: A registered professional engineer shall design the site to comply <br /> with the volume reduction requirement outlined in the County's 2023 SWQCCP <br /> c) Trash: A registered professional engineer shall design the site to comply with the trash <br /> control requirement outlined in the County's 2023 SWQCCP. <br /> 10) Prior to release of the building permit, the owner shall enter into an agreement with San <br /> Joaquin County for post-construction maintenance of stormwater quality facilities. <br /> 11) Prior to release of the building permit the applicant shall submit a Storm Water Quality <br /> Control Plan (SWQCP) to Public Works that complies with all requirements of the 2023 <br /> SWQCCP <br /> 12) Prior to release of the building permit the applicant shall submit the Storm Water Pollution <br /> Prevention Plan (SWPPP) to Public Works. A copy of the approved SWPPP and all <br /> required records, updates, test results and inspection reports shall be maintained on the <br /> construction site and be available for review upon request. <br /> SR:GG <br />