My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHARTER
>
770
>
2300 - Underground Storage Tank Program
>
PR0546068
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2026 3:19:02 PM
Creation date
5/19/2025 2:10:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0546068
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0026052
FACILITY_NAME
7-ELEVEN STORE #41216
STREET_NUMBER
770
Direction
W
STREET_NAME
CHARTER
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16323023
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
770 W CHARTER WAY STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGING TESTING <br /> ® Check this box if tank gauging is used only for inventory control. <br /> EJ Check this box if NO tank gauging equipment is installed. Yes No NA <br /> (Do not complete this section if either box is checked. <br /> All wiring has been: 1) visually inspected for kinks, breaks and proper entry and 0 Ll L1 <br /> termination; and 2] tested for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup L Li Lj <br /> to ensure that floats move free) , fu nctional ly tested. and confirmed operational? <br /> Was accuracy of system's product level readings tested? <br /> Was accuracy of system's water level readings tested? 0 Ll 0 <br /> Were all probes reinstalled properly? L) Ll Ll <br /> Were all items on the equipment manufacturer's maintenance checklist completed? LA L � <br /> Probe ID Probe Model Tanks Monitored Pass Fail <br /> Ll J <br /> L) Lj <br /> 1j Ll <br /> LA 11 <br /> LJ L <br /> [19. COMMENTS <br /> Describe all answers marked 'No'or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.