Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared. <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> Site Address: Fast N Esy#161399 E Yosemite Ave Manteca CA 95336 <br /> STORE *PIPLL\G <br /> (-ARROWS) <br /> . . . . . Dranine of <br /> . . . . . . pipes exit of <br /> PV VENTS.. DIRT nirnp and UDC'.-. <br /> No underground <br /> . . ' . . . . dratling L° <br /> . _ . . . . ai;QX"ive <br /> . . . . cannot speculate <br /> TLS hltte�%' + <br /> 350 <br /> E-STOP <br /> . . N <br /> 0 <br /> t <br /> W <br /> 0 <br /> ' o <br /> d <br /> L L L . . . . . . <br /> . . . <br /> AP ooAp <br /> . _ . . . .2 5. . .wh D IE. <br /> X R X . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . __ <br /> np <br /> e0 0 0 . . . . . . . . . . . . . . . . . . . . . . . . <br /> 7 . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . <br /> R <br /> 4 RF <br /> F . . . . . . . . <br /> S. . . . . . . . . . . . . . 8. urlDim Snap Taps. <br /> F <br /> . . . . . . . . . . . . . . . . . . KEY <br /> An)•items undergroumd that are not visible to the cwtif}-mg t c micim are a A=A TfULAR <br /> professional opmicn anl}•and are soleh,for infonnafdonal purposes. Drming not to F=FILLS <br /> scale T=TCRBLNE <br /> P=PROBE <br /> YOS EM ITE AVE V=VAPOR <br /> X=SM P SENSOR <br /> L=Leak Detector <br /> B=Brine Seuso r <br /> I=Smart Sensor <br /> S=STP <br /> C=Floats&Chins <br /> Date map was drawn:613I20 E=EStop <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include n,rather than this page,with your Monitoring System Certification. On your sae plan. <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces.sumps,dispenser pans,spill containers,or other secondary containment areas:mechanical or electronic line leak detectors:and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Page 6 of 6 <br />