My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2026 9:08:56 PM
Creation date
6/3/2025 1:35:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0521942
PE
2371 - UST FACILITY - 1702 COMPLIANT
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16902016
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1427 S AIRPORT WAY STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer 0 Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure 0 Vacuum ❑ Hydrostatic <br /> Test Equipment Used:0-30 inHG Gauge <br /> Tank ID 87/91 <br /> Tank Manufacturer Trusco <br /> Tank Capacity 20,000 <br /> Test Start Time 10:15 am <br /> Initial Reading 10 hg <br /> Test End Time 11:15 am <br /> Final Reading 10 hg <br /> Change in Reading 0 <br /> Pass/Fail Criteria 0 <br /> Tightness Test Results p Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> -11 <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ID Industry Standard ❑ Professional Engineer <br /> Test Type 0 Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used:0-10 PSI Gauges <br /> Pipe Run ID 87 Product 91 Product 87 Vent 91 Vent <br /> Pipe Manufacturer Environ Environ Smith Smith <br /> Test Start Time N/A N/A 10:25 am 10:25 am <br /> Initial Reading N/A N/A 3 psi 3 psi <br /> Test End Time N/A N/A 11:25 am 11:25 am <br /> Final Reading N/A N/A 3 psi 3 psi <br /> Change in Reading N/A N/A 0 0 <br /> Pass/Fail Criteria 0 0 0 0 <br /> Tightness Test Results ❑ Pass 0 Fail ❑ Pass 0 Fail 0 Pass ❑ Fail 0 Pass ❑ Fail <br /> Pipe Run ID Vapor Return <br /> Pipe Manufacturer Smith <br /> Test Start Time 10:25 am <br /> Initial Reading 5 psi <br /> Test End Time 11:25 am <br /> Final Reading 5 psi <br /> Change in Reading 0 <br /> Pass/Fail Criteria 0 <br /> Tightness Test Results p Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.