Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) T1 87 T2 91 T3 Diesel <br /> Are both vent and tank riser piping Yes ❑X Yes x❑ Yes ❑ Yes <br /> secondarily contained? ❑ No ❑ No ❑ No ❑ No <br /> OPE Model OPw OPw OPw <br /> What is the OPE response when ❑X Shut off ❑X Shut off ❑X Shut off ❑ Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) x❑ Restricts ❑X Restricts ❑x Restricts ❑ Restricts <br /> Flow Flow Flow Flow <br /> ❑ Audible ❑ Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> ❑ Visual ❑ Visual ❑ Visual ❑ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ❑ Yes* ❑ Yes* ❑ Yes* ❑ Yes* <br /> that may interfere with the OPE operation? ❑X No ❑X No ❑X No ❑ No <br /> At what level in the tank is the OPE set to 101" 101.25" 101" <br /> activate? Inches from bottom of tank <br /> What is the percent capacity of the tank at 90.9% 91.07% 91.87% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to ❑X Yes x❑ Yes* ❑X Yes* ❑ Yes* <br /> respond when the stored substance ❑ No ❑ No ❑ No ❑ No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results x❑ Pass Z Pass X❑ Pass ❑ Pass <br /> ❑ Fail ❑ Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> * Mark here if: <br /> ❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />