My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1932
>
2300 - Underground Storage Tank Program
>
PR0231097
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2026 12:02:55 PM
Creation date
6/5/2025 4:48:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231097
PE
2361 - UST FACILITY
FACILITY_ID
FA0004016
FACILITY_NAME
SUSD-CORPORATE YARD
STREET_NUMBER
1932
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11708027
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1932 EL PINAL DR STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V 1re) IcA- 9 <br /> ego <br /> Dynamic Back Pressure Test <br /> P.O. BOX 1394 TP 201.4 <br /> I LAFAYETTE CA 94549 <br /> 888-500-CHEK Static Pressure Decay Test <br /> TP 201.3 <br /> Owner/Contractor/Eng: TEST DATE: 5/7/2025 TIME: UST ® AST <br /> SITE NAME: STOCKTON UNIFIED SCHOOL ED STEARNS ❑ PT ❑ Startup Test ® Compliance Test <br /> Address: 1932 EL PINAL DR AGENCY SJVAPCD <br /> I declare, under penalty of perjury under the laws of the state <br /> City: STOCKTON,CA of California that based on information and belief formed <br /> Inspector: <br /> Phone: after reasonable inquiry, the statements and information <br /> provided in the document are true,accurate,and complete. present ❑ Not Present <br /> Contact: <br /> TECH SIGNATURE: <br /> Confirmation# Permit or Facility# <br /> #DISPENSERS 1 DISPENSER Make: GASBOY NOZZLE Make:HEALY PV Valve Make:HUSKY <br /> #TOTAL NOZZLES 2 Model: Model: 900 Model: 5885 <br /> MANIFOLDED: Yes ® No❑ BALANCE ASSIST X Assist Type: <br /> Tank 1 Tank 2 Tank 3 Tank 4 TOTAL <br /> Fuel Grade 87 Initial pressure before testing-0 "we <br /> #Nozzles per Tank 2 EQUIPMENT <br /> Actual Tank Capacity 15023 Decay: x Blockage: <br /> Gasoline Volume 4540 Incline Manometer ❑ Incline Manometer ❑ <br /> Ullege(Capacity minus Volume) <br /> 10483 Magnehelic Guage ❑ Magnehelic Guage <br /> Phase I System Type:2pt EVR Coaxial E( V R EVR <br /> Digital Manometer ® I Digital Manometer ❑ <br /> Initial Test Pressure(Inches Water)2/0 2.0 Equipment Calibration Date: 4/1/2024 <br /> 1.99 Drift Check End Value: 0 PASS <br /> PSI ,1 Minute(Inches Water) Nitrogen Intro.Point: PHASE 1 <br /> PSI @ 2 Minutes 1.99 <br /> PSI @ 3 Minutes 1.98 Allowable Fill Time .21NCH 6.47 <br /> PSI @ 4 Minutes 1.98 Time 1:2.43 <br /> Final Pressure @ 5 Minutes(Inches Water) <br /> 1.98 Time 2: <br /> Allowable Final Pressure(GARB) <br /> 1.90 Time 3• <br /> Liquid Removal Check,Dynamic Back <br /> ------ PASS Pressure(if due),and Parts& <br /> ----'-- ------- -'----- Re airs Are Listed on Page 2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.