My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
1153
>
2300 - Underground Storage Tank Program
>
PR0231413
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2026 12:22:28 PM
Creation date
6/12/2025 3:28:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231413
PE
2361 - UST FACILITY
FACILITY_ID
FA0003122
FACILITY_NAME
QUIK STOP MARKET #551138
STREET_NUMBER
1153
STREET_NAME
LINCOLN
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23119012
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1153 LINCOLN BLVD TRACY 95376
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTRUCTIONS FOR SEALING B-2000 <br /> FLOAT CUP RESERVOIRS <br /> Approved materials: Bravo FRP Plug and Bravo Epoxy Kit <br /> 1) Remove all liquids, debris and contaminants from the interior of the B-2000 UDC. <br /> 2) Remove the float and float arm assembly so it is clear of the float cup area. <br /> 3) Abrade and clean up the float cup area. Remove mineral buildup, dirt and any. other debris. If rust <br /> is present, be cautious to not cut yourself, or bend any metal inwards. Use a wire bristle brush to rough <br /> up and smooth out rusty areas if present. <br /> 4) Clean the top edge of the float cup where it intersects with the bottom floor of the B-2000 UDC. <br /> 5) Keep the float cup area dry. If water is present under the cup, or it is flowing up into the <br /> containment sump, inject a water barrier polyurethane foam or filler in order to stop the flow of liquid. <br /> 6) Ensure the float cup and interior of the sump is completely clean and absolutely dry prior to <br /> adhesive application. <br /> 7) Ensure that the exterior of the fiberglass float cup plug is clean of fingerprints, debris and <br /> contaminants. Clean with acetone to be certain and maintain a clean and dry state. <br /> 8) Apply mixed Bravo adhesive generously to the bottom and outside edges of the fiberglass float cup <br /> plug, applying a heavy amount around the lower half. Use chip brush to wet out the interior of the <br /> existing float cup area with adhesive as well. <br /> 9) Insert the plug into the float cup and press firmly, rotating it until the float cup bottoms out. You <br /> should have applied enough adhesive so that it oozes out. Press it as far down as you can until the <br /> top edge of the plug is flush with the bottom floor of the B-2000 UDC. <br /> 10) Using the chip brush, spread around or apply adhesive at the seam between the plug and the <br /> bottom floor of the B-2000 UDC where they intersect. <br /> 11) Allow a full cure of 8 hours at or above 70°F. Do not allow the adhesive to come in contact with <br /> water or moisture while it is curing. <br /> 12) Water test the UDC per typical procedures. <br /> ii-B2000-PLUG-13A <br /> BWWW.SBRAVO.COM � made Cer(ified NWENC n1�P�1 <br /> PROBLEM 800- 11-BRAV O �•. in USA •' ` LW P' � MEMBER <br />
The URL can be used to link to this page
Your browser does not support the video tag.