Laserfiche WebLink
Received via CERS <br /> Underground Storage Tank CERS submittal 8/15/2025 <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by © Manufacturer 0✓ Industry Standard © Professional Engineer <br /> Test Type M Pressure Vacuum 0 Hydrostatic <br /> Test Equipment Used: Vacuum Gauge <br /> Tank ID 87-1 87-2 91 <br /> Tank Manufacturer Xerxes Xerxes Xerxes <br /> Tank Capacity 10K 10K 8K <br /> Test Start Time 9:45 10:07 10:26 <br /> Initial Reading -10 Hg -10 Hg -10 Hg <br /> Test End Time 9:45 11:07 11:26 <br /> Final Reading -10 Hg -10 Hg -10 Hg <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria +/-0 +/-0 +/-0 <br /> Tightness Test Results M✓ Pass © Fail ® Pass Ej Fail ® Pass © Fail 0 Pass 0 Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by 0 Manufacturer 0 Industry Standard © Professional Engineer <br /> Test Type © Pressure 17 Vacuum © Hydrostatic <br /> Test Equipment Used: Pressure Gauge <br /> Pipe Run ID 87-1 87-2 91 <br /> Pipe Manufacturer Smith Smith Smith <br /> Test Start Time 12:22 09:55 09:55 <br /> Initial Reading 5 Psig 5 Psig 5 Psig <br /> Test End Time 13:22 10:55 10:55 <br /> Final Reading 5 Psig 5 Psig 5 Psig <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria +/-0 +/-0 +/-0 <br /> Tightness Test Results Pass El Fail 0 Pass ® Fail ©âœ“ Pass Ij Fail 0 Pass 0 Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results 0 Pass 0 Fail C Pass © Fail Ej Pass © Fail C Pass 0 Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2of5 <br />