My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1048
>
2300 - Underground Storage Tank Program
>
PR0231462
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 8:44:01 PM
Creation date
6/12/2025 3:35:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231462
PE
2361 - UST FACILITY
FACILITY_ID
FA0000508
FACILITY_NAME
7- ELEVEN INC # 17647
STREET_NUMBER
1048
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
21903003
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Lookup Error
ERROR [38000] ERROR: Invalid customid as arg 3! at line 18.; Error while executing the query
Site Address
1048 W YOSEMITE AVE MANTECA 95337
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 16. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) Regular Premium <br /> Are both vent and tank riser piping r Yes r:Yes r Yes r Yes <br /> secondarily contained? r No r No r No r No <br /> OPE Model OPw oPw <br /> Shut off Shut off Shut off Shut off <br /> Flow Flow Flow Flow <br /> Restricts Restricts Restricts Restricts <br /> What is the OPE response when activated? Flow Flow Flow Flow <br /> (Check all that apply) Audible Audible Audible Audible <br /> Alarm Alarm Alarm Alarm <br /> Visual Visual Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping r Yes* r Yes* r Yes* r Yes* <br /> that may interfere with the OPE operation? r No r No r No r No <br /> At what level in the tank is the OPE set to <br /> activate? (Inches from bottom of tank) 80.25 79.875 <br /> What is the percent capacity of the tank at <br /> which the OPE activates? 94.8 94.5 <br /> Is the OPE in proper operating condition to r Yes r Yes r Yes r Yes <br /> respond when the stored substance reaches r No r No r No r No <br /> the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> r Pass r Pass r Pass r Pass <br /> OPE Inspection Results r Fail r Fail r Fail r Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> *Mark here if: <br /> f" Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br />
The URL can be used to link to this page
Your browser does not support the video tag.