My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOOD
>
5655
>
2300 - Underground Storage Tank Program
>
PR0540345
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2026 8:36:44 PM
Creation date
6/12/2025 4:48:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0540345
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0023065
FACILITY_NAME
FedEx Ground - Tracy
STREET_NUMBER
5655
STREET_NAME
HOOD
STREET_TYPE
WAY
City
Tracy
Zip
95377
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
5655 Hood WAY Tracy 95377
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Monitoring System Certification Form <br />5. MONITORING SYSTEM AND PROGRAMMING <br />A separate Monitoring System Certification Form must be prepared for each control parcel. <br />Make of Monitoring System <br />Model -of Monitoring System <br />Software Version Installed <br />Control Panel <br />Control Panel <br />Veeder Root <br />TLS -350 <br />134.00 <br />Attach the post -certification reports if the monitoring system is capable of generating <br />Yes <br />No <br />NA <br />either, RIMonitoriing System Set-up 0 Alarm History Report <br />All monitoring equipment is operational per manufacturer's specifications? <br />Secondary containment systems are free of damage, debris, or liquid? <br />Are the audible and visual alarms operational? <br />A <br />Ell <br />All sensors have been: 1) visually inspected for wiring kinks, breaks and residual <br />buildup on floats; and 2) tested for functionality and confirmed operational? <br />Are all sensors installed to detect a release at the earliest opportunity in the <br />secondary containment? <br />The monitoring system set-up was reviewed, and proper settings confirmed? <br />21 <br />Ll <br />J <br />Was the monitoring control panel's backup battery visually inspected, functionally <br />tested; and confirmed operational? <br />Does the flow of fuel stop at the dispenser if a release is detected in the under- <br />A <br />11 <br />Ell <br />dispenser containment? <br />Does the turbine automatically shut down if the piping secondary containment <br />monitoring system fails to operate or is electrically disconnected? <br />Does the turbine automatically shut down if the piping secondary containment <br />monitoring system detects a release? Which sensors initiate positive shut down? <br />(Check all that apply) Z Sump ® UDG <br />If monitoring system alarms are relayed to a remote monitoring center, is all <br />communication equipment operational? <br />Describe all answers marked "'No" or "Fail" and proposed remedy in Secdon 9. <br />List ail monitoring equipment either replaced or repaired in Section S <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.