My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOOD
>
5655
>
2300 - Underground Storage Tank Program
>
PR0540345
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2026 8:36:44 PM
Creation date
6/12/2025 4:48:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0540345
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0023065
FACILITY_NAME
FedEx Ground - Tracy
STREET_NUMBER
5655
STREET_NAME
HOOD
STREET_TYPE
WAY
City
Tracy
Zip
95377
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
5655 Hood WAY Tracy 95377
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Monitoring System Certification Form <br />7. LINE LEAK DETECTOR TESTING <br />Ll Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br />Simulated release rate verified: (Check all that apply.) <br />0 3 GPH L 4.1 GPH LJ 0.2 GPH <br />Yes <br />No <br />1A <br />Has the testing apparatus been properly calibrated? <br />0 <br />D <br />Ell <br />For emergency generator tank systems, does the LLD create an audible and visual <br />alarm when a leak is detected? <br />LA <br />J <br />0 <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a <br />release is detected? <br />For electronic LLDs, does the turbine automatically shut off when a release is <br />detected? <br />0 <br />Li <br />Lj <br />For electronic LLDs, does the turbine automatically shut off if any portion of the <br />monitoring system is disabled or disconnected? <br />Ll <br />Il <br />For electronic LLDs, does the turbine automatically strut off if any portion of the <br />monitoring system malfunctions or fails a tightness fest? <br />0 <br />Lj <br />Ll <br />For electronic LLDs, have all accessible wiring connections been visually inspected <br />for kinks and breaks? <br />0 <br />Ll <br />El <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />0 <br />L3 <br />Q <br />Were all LLDs confirmed operational within regulatory requirements? <br />0 <br />E-) <br />Ell <br />LLD ID <br />LLD Model <br />Lines Monitored <br />Pass <br />Fail <br />Q1 <br />848480-001 <br />T1 & T2 DSL PROD. LINE <br />R) <br />Li <br />li <br />L) <br />Ll <br />li <br />Ll <br />Il <br />Ll <br />Ii <br />® <br />li <br />Ll <br />D <br />J <br />Lj <br />D <br />D <br />Ll <br />1:1 <br />Li <br />Li <br />Li <br />Q <br />Describe ail answers marked "'No"or "Fail"' and proposed remedy in Section 9. <br />List afl monitoring equipment either replaced or repaired in Section 9 <br />Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.