My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
OLIVE
>
1030
>
2300 - Underground Storage Tank Program
>
PR0231704
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2026 7:39:02 PM
Creation date
6/17/2025 10:46:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231704
PE
2361 - UST FACILITY
FACILITY_ID
FA0001060
FACILITY_NAME
QUIK STOP MARKET #076
STREET_NUMBER
1030
Direction
S
STREET_NAME
OLIVE
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
15726422
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1030 S OLIVE AVE STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Environmental Reporting System (CERS) Underground Storage Tank- Monitoring Plan <br /> Facility/Site <br /> UIK STOP MARKET#076 UST Tank#/CERS Tank CERSID <br /> ID# 10180695 <br /> 1030 S Olive Ave TA0508102/ <br /> 10180695-001 <br /> Stockton,CA 95215 Tank Info:Installed Date:11/5/199812:00:00 AM-Tank Use:Motor Vehicle Fueling-Tank <br /> Contents:Regular Unleaded-Type Of Tank:Double Wall-Piping Construction:Double- <br /> walled <br /> Pipe Monitoring is Performed Using the Following Method(s) <br /> Yes Continuous Monitoring of Piping Secondary Containment <br /> Piping Secondary Containment Panel Manufacturer Leak Sensor Manufacturer <br /> Dry VEEDER-ROOT(GILBARCO) VEEDER-ROOT <br /> Panel Model# Leak Sensor Model# <br /> TLS-350(GILBARCO EMC) 0794380-208 <br /> e5 Leak Alarm Triggers Automatic Pump Shutdown <br /> Yes Failure/Disconnect Triggers Pump Shutdown <br /> Yes Mechanical Line Leak Detector Performs 3 GPH Leak Test <br /> MLLD Manufacturer MLLD Model <br /> VMI 99LD-2000 <br /> Electronic Line Leak Detector Performs 3 GPH Leak Test <br /> ELLD Manufacturer ELLD Programmed In-Line Testing ELLD Triggers Automatic Pump Shutdown <br /> ELLD Model ELLD Failure/Disconnect Triggers Automatic Shutdown <br /> Pipeline Integrity Testing Visual Pipeline Monitoring <br /> Pipeline Integrity Testing Frequency Visual Pipeline Monitoring Frequency <br /> Suction Piping Meets Exemption Criteria <br /> No Regulated Piping Per Health and Safety Code,Division 20,Chapter 6.7 Is Connected To The Tank System <br /> Other Pipeline Monitoring <br /> Under Dispenser Containment(UDC)Monitoring <br /> UDC Monitoring Detection of Leak into UDC Triggers Audible and Visual Alarms <br /> Float and Chain Assembly <br /> UDC Leak Alarm Triggers Automatic Pump Shutdown <br /> DC Panel Manufacturer <br /> eeder Root Failure/Disconnection of UDC Monitoring System Triggers Automatic Pump Shutdown <br /> DC Panel Model# <br /> LS 350 UDC Monitoring Stops Flow of Product at Dispenser <br /> DC Leak Sensor Manufacturer Yes <br /> Bravo UDC Construction <br /> DC Leak Sensor Model Single-walled <br /> Floats&Chain UDC Secondary Containment Monitoring <br /> Leak Within Secondary Containment of UDC Causes Audible and Visual Alarms <br /> Periodic System Testing <br /> ELD Testing <br /> Yes Secondary Containment Testing <br /> Yes Spill Bucket Testing <br /> Printed on 7/8/2025 8:44 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.