Laserfiche WebLink
Underground Storage Tank <br />Monitoring System Certification Form <br />8. IN -TANK CADGING TESTING <br />® Check this box if tank gauging 1s used only for inventory control. <br />❑ Check this box if NO tank gauging equipment is installed. <br />o not complete this section if either box is checked, <br />Yes <br />No <br />NA, <br />All wiring has been: 1) visually inspected for minks, breaks and proper entry and <br />termination; and ) tested for ground faults? <br />0 <br />❑ <br />❑ <br />Were all in -tank gauging probes visuaElly inspected for darnage and residue buildup <br />to ensure that floats move freely, functionally tested and confirmed operational? <br />❑ <br />0 <br />0 <br />❑ <br />❑ <br />❑ <br />Was accuracy of system's product level readings tested? <br />Was accuracy of system's water level readings tested? <br />0 <br />Q <br />❑ <br />Were all probes reinstalled properly? <br />® <br />IR <br />❑ <br />❑ <br />❑ <br />El <br />Were ail items on the equipment manufacturer's maintenance checklist completed? <br />Probe ID <br />Probe Model <br />Tanks Monitored <br />Pass <br />Fail <br />I <br />VIR MAG 7 <br />regular <br />CR <br />p <br />VR MAG 1 <br />Premium <br />Q <br />R MAC 1 <br />Diesel <br />❑ <br />�J <br />❑ <br />El <br />❑ <br />❑ <br />❑ <br />9. COMMENTS <br />.Describe all answers marked 'No" or "Fail" and proposer! remedy. <br />' List all monitorings equipment either replaced or repaired. <br />Page 5 of 6 <br />