My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2026 8:12:43 PM
Creation date
6/27/2025 4:28:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231416
PE
2361 - UST FACILITY
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
3425 TRACY BLVD TRACY 95376
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IEnvironmental Health Department <br /> COUNTY <br /> UST SYSTEM RETROFIT OR REPAIR <br /> 1. Site map enclosed? YES`{„t' NO[] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced. Ensure a copy of <br /> the"Site Health and Safety Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements, If repairing a component, describe <br /> how this will be done. (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br /> use the UST Installation Application pages 4-8 as necessary for a timely <br /> plan review): <br /> + ' LIJU <br /> 4. List Hof equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> V�Q'y-�'-A C�} f��1�c l''l/ Z �—}kCD <br /> VD <br /> ()PLO S Y- VrA , icy 'R-o t,S2 <br /> 5. Decontamination Procedures: <br /> a, Will piping be decontaminated prior to removal? YES [] NO[] <br /> b. Identify contractor performing decontamination: <br /> Name Phone(. ) <br /> Address City Zip <br /> 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.