My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAROLYN WESTON
>
601
>
2300 - Underground Storage Tank Program
>
PR0546181
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2026 3:15:51 PM
Creation date
7/3/2025 12:56:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0546181
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0026131
FACILITY_NAME
7-ELEVEN INC. #38616
STREET_NUMBER
601
Direction
W
STREET_NAME
CAROLYN WESTON
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16422019
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
601 W CAROLYN WESTON BLVD STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMPORTlilXT: The inVlYuCt one itielOW for the 7150 Upm Tube Length=C +(A) <br /> Overfill P venrtion Valve awe w tm for 1 initial <br /> aW W%talFf at 95%,bmk on bar adjuvwd to Au" Fcw testable nvo dell only,e+d M in'r; <br /> at my d Wred teak copodtlr. Pkos&opoloct#Ira Au- Upper Tube 1Lerrgth=C+(A)- 1.1 f2" <br /> tha ky Waging Juried -den [AMJ)and review khcaL <br /> stmAa and nadonW ra &mto datormbne the regulaDo- YES Upper tube length is 6-112"pkrs ft riser pipe <br /> rY"gt**n%enW gowerning shutoff capadty in your measurement(A). <br /> as"I as take kiw accoum other conskkwa- <br /> tiam mKh as extreme tank tillt k all caws,the up- Upper Tube Length= 6-1/2'+(A) <br /> p w tulle must Ards kft the tank me least 61 W <br /> to amore tigt the valve can shut of flow Into the For testable rnadels oet ly, ending In'r. <br /> tank complatoly before the top of t h e Alt is wetted Upper Tube Lee► =6-1 " +(A)-1 t1/2W <br /> as per EPA requirements. <br /> NOiE: You errant find the amml tank p►podty num- <br /> HOW TO LOCATE THE PIDSITION OF THE 715O AT ber that dates to the 6-11Z"'+(A)depth for the <br /> 05%TANK CAPACrTV station racwds. This number mawy also ba used for <br /> (Sh&-odlr pvtnd em 6a add to oey capadty to the prt gwmm of cakbredng an ukKlmak tank lust <br /> "MPty 1Wth A Mj RegarkenM"?b) system. <br /> The length of the upper tube and the placement of tyre Tape meow)m <br /> 71 SO va ve body detemP gjne the shut-off point- Follaw- <br /> ing the standard in&krLiMons for the DPW 7150 will pro- <br /> eidrfor iarftf dust i ar 95W in all rases,the uppex <br /> te,be length m u5t be a rni n irimum of 6-1/2' plus the <br /> WnTh of the ri see pipe- AP length measumments a re In <br /> inches. <br /> Rle�r�Ipe <br /> iNSTRUCTIGM wMh Floe (A) <br /> 1 heft rank S <br /> i) alAdaptar <br /> capdtify CUT galloriA; ft43[M rareuik CaPbtatJO x vo +B) <br /> T*�i <br /> chart provided key tank manufacturer, To rank <br /> 2) Calculate 95%of�apaadty <br /> 3) Locate the 95%vokume n under on the tank cal ibra- <br /> Wn Chart- T <br /> 4) rind the d436dck number{gyp which convsportds to <br /> the 95%tank valunw. And.Find the dpstkk num- Figum 7 <br /> ber(Y)which corresponds to the IOU%vofume. <br /> 5) F>L; tract the dipoIck number( )from the tank di EXAMPLE <br /> arneter M to fired lbe upper tube reference num bee <br /> 1) For an Owens-Corning Medel3Fiberglam�*-Tank <br /> akhraticn Chan <br /> (Y) -M = l Tanis C_ ci - 1 O OW94,nornInal 9AO3 gal. <br /> 6) Subtract 2"frorn (Z)to Find the upper tube depth flOTF- Vw a0ami aModft ark <br /> fC1• 2) 9596 of actual tank cahpadiy 0.95 x 9403 gal._ <br /> (Z)-2"-C 8933 qW- <br /> 7f Is C 4c*ss tFrin t 1 f 3) The closest"umber witich is less than 8933 gal.Is <br /> 891 D gal,C hoasi rig t1lbe CkMrA number ke n"r+ <br /> 95%of actual capac icy ensures that the in F;ial <br /> NO Upper tube length Fs C plus the dPstance from shutoff anll occur when rile tank is"more than <br /> the top V the Face Seai Adaptor in5tailed on 95%full_ <br /> the riser pipe to the inside.top I ip of the storage A) The calibration r-hart roadllnQ ni 8910 cgdl.corms <br /> tank(A). sponds eo a dipstick mea<surernerht of 82'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.