My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAROLYN WESTON
>
601
>
2300 - Underground Storage Tank Program
>
PR0546181
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2026 3:15:51 PM
Creation date
7/3/2025 12:56:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0546181
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0026131
FACILITY_NAME
7-ELEVEN INC. #38616
STREET_NUMBER
601
Direction
W
STREET_NAME
CAROLYN WESTON
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16422019
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
601 W CAROLYN WESTON BLVD STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 13. DIIMPU F1FtST HOLE STIEP IS: DtMP LE REMAINING HOLD <br /> kerrmove tool, Remove any chips or burrs from ttke drill- Remove any chips Dr burrs(torn the drib+)opera bn. <br /> ing operation. Place the assem bly on a solid surface. N mole the next( )Moles as done in Step 13. Make su re <br /> Using the punch suppliied v6th the 71 SO-TOOL, 71 St the assembly Is on a solid surface when punch~rxg- Aftef <br /> T0(XC,and 71SO-TOOLCf, align the tip of the pund3 punching,irenv"any chips that may haw fallen into <br /> with t dnokd hak and dimple tiles upp& drop tube by the 0 m tube snow hole. <br /> striking the punch with a hammer until thedrop tube is <br /> formed inw countersunk hole in the inlet tube. After <br /> purdhing, Gemove any chips that may have fallen into <br /> the ink-t tube screw hafe. <br /> Align punch with <br /> drilled hole <br /> Figure 15 <br /> * STEP 16: ASSEMBLE OTHER SCAEM <br /> Apply black molt'grease to screws arxd tighten the oth- <br /> er(2)screws into in let-tube with a screwddwr as done <br /> Fr`9VM 73 In Step 1 it. Use only the Mpbte screws that are supplied <br /> +rwizh Lhe ynm Searing torque Is 20 in Abs rnim to 35 in.- <br /> STEP 14: ASSEMBLE IFI RST SCREW lbs max, DD not over Vghte ri. <br /> Ensure that the drop tube was farmed Into the couu rGter- <br /> sunk screw hole as shown In Figure 14 If rat return to S71P 17: APPLY GREASE TO LOWER D-#iMG AND <br /> Step 13. Apply black maly grease to screw and irighterw BOGY TIHREADS <br /> first v-rew into Inlet tuts o4th a screwdriver. Use only Apply black molt'grease to the lower tube o-ring and <br /> the taptite screws that are supplied with d,e unit Seat- body threads as shown. Ntapke sum coverage i6 corm <br /> ir,9 torque Is 2O in-ibs min.to 3S in-lbs max- Screw head pletely around the o-r1ng. IraUll a-ring in gnxhe just <br /> should be flush with tf'we drop tube, Vo not over tlght- ab['w threads, <br /> en. <br /> Apply grease <br /> } aroLkrd o-ring <br /> Yam_ <br /> G*�w�amn«bra�..µ iao <br /> O ir+g <br /> groove $4dyr}-reads <br /> Nure 14 -- - �. . _.. - <br /> Figum 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.