Laserfiche WebLink
PA-2500133 (MS) Early Consultation, SU-2500680 Page 2 of 2 <br /> 11052 E. Weigum Street, Lodi July 16, 2025 <br /> 5. Construction of an individual domestic water well under permit and inspection by the <br /> Environmental Health Department is required at the time of development (San Joaquin <br /> County Development Title, Section 9-1115.3). <br /> 6. Any geotechnical drilling shall be conducted under permit and inspection by The <br /> Environmental Health Department (San Joaquin County Development Title, Section 9- <br /> 601.010(b) and 9-601.020(i)). <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/ehd <br />