Laserfiche WebLink
Forward Landfill - 3 - 3 August 2017 <br />San Joaquin County <br />• During the proposed pump test, water levels in Monitoring Wells AMW-22, AMW-23, <br />AMW-25/25s, AMW-28/28s and AMW-30/30s shall be recorded to document aquifer <br />response in deeper zones affected by the release and at the distal portions of the plume. <br />• The Interim Groundwater Plume Remediation System Installation Report, which is due <br />by 1 November 2017 must include a water balance to demonstrate adequate storage <br />capacity for the additional treated groundwater. <br />All reports shall be uploaded to GeoTracker and an upload certification shall be e-mailed to <br />centralvalleysacramento@waterboards.ca.gov. To ensure that each submitted report is routed <br />to the appropriate staff, please include the following information in the body of the email: Attn: <br />Brendan Kenny, Compliance Unit, the date and title of the report, and the facility’s CIWQS place <br />ID (CW-225098). <br />If you have any questions, please contact me at (916) 464-4635 or by email at <br />bkenny@waterboards.ca.gov. <br />-Original Signed By- -Original Signed By- <br />Brendan Kenny Howard Hold, PG # 7466 <br />Engineering Geologist Acting Supervisor <br />Compliance and Enforcement Unit Compliance and Enforcement Section <br />cc: William Lopez, Geo-Logic Associates, San Diego <br /> Robert McClellon, San Joaquin County Environmental Health Department, Stockton