Laserfiche WebLink
WELL INSTALLATION AND INTERIM REMEDIAL ACTION REPORT <br />www.arcadis.com <br />FINAL_Forward CHCF (CDCR) Well Installation Report_10182024 <br /> <br />27 <br />RWQCB. 2024b. Email from Brendan Kenny (RWQCB) to Dalia Rumani (Arcadis on behalf of Forward) re: <br />approval to install AMW-61S/M. June 21. <br />SWT Engineering, Inc. 2013. Joint Technical Document, Forward Landfill. December. <br />Theis, C.V., 1935. The relation between the lowering of the piezometric surface and the rate and duration of <br />discharge of a well using groundwater storage, Am. Geophys. Union Trans., vol. 16, pp. 519 -524. <br />USEPA. 2008. A Systematic Approach for Evaluation of Capture Zones at Pump and Treat Systems. EPA/600/R - <br />08/003, 2008. January 29. Available online at: <br />https://cfpub.epa.gov/si/si_public_record_report.cfm?Lab=NRMRL&dirEntryId=187788.